Metraipolis › archive › dc_fc005721c3d7

Applying the Toyota production system to decrease the time required to transport patients undergoing surgery from the general ward to the operating room and… — Europe PMC PMID:36569138

Source
Europe PMC (en)
Original
https://europepmc.org/article/MED/36569138
DOI
10.3389/fmed.2022.1054583
License (as archived)
solo-consultazione
Archived
2026-10-08T03:00:33.647Z
SHA-256 of the archived text
2ec9357e23c1bb0e9099f89b0741b7b2fbaa4eb12a0376cca99e82406eefc242
Stable URL of this page
https://metraipolis.com/documento/dc_fc005721c3d7

How to cite

Applying the Toyota production system to decrease the time required to transport patients undergoing surgery from the general ward to the operating room and… — Europe PMC PMID:36569138 — Europe PMC (en), https://europepmc.org/article/MED/36569138 (solo-consultazione); archived copy: https://metraipolis.com/documento/dc_fc005721c3d7 (Metraipolis archive dc_fc005721c3d7, sha256 2ec9357e23c1bb0e9099f89b0741b7b2fbaa4eb12a0376cca99e82406eefc242)
BibTeX
@misc{dcfc005721c3d7,
  title = {Applying the Toyota production system to decrease the time required to transport patients undergoing surgery from the general ward to the operating room and… — Europe PMC PMID:36569138},
  howpublished = {Europe PMC (en)},
  url = {https://europepmc.org/article/MED/36569138},
  note = {License solo-consultazione; archived copy https://metraipolis.com/documento/dc_fc005721c3d7; sha256 2ec9357e23c1bb0e9099f89b0741b7b2fbaa4eb12a0376cca99e82406eefc242},
  year = {2026}
}

Archived text

The text is not reproduced here: the archive holds it as solo-consultazione (consultation only, no republication). Read it at the original source: https://europepmc.org/article/MED/36569138. Agents can read the archived copy with the MCP tool read_document.