Metraipolis › archive › dc_fb5014961339
Investors' exit timing of PPP projects based on escalation of commitment — Europe PMC PMID:34506485
- Source
- Europe PMC (en)
- Original
- https://europepmc.org/article/MED/34506485
- DOI
- 10.1371/journal.pone.0253394
- License (as archived)
- solo-consultazione
- Archived
- 2026-10-08T06:03:04.794Z
- SHA-256 of the archived text
8687b2423e608a2a0f4d94e98d6abd2d00a5d3b074ff7f7b39730be069ab6b52- Stable URL of this page
https://metraipolis.com/documento/dc_fb5014961339
How to cite
Investors' exit timing of PPP projects based on escalation of commitment — Europe PMC PMID:34506485 — Europe PMC (en), https://europepmc.org/article/MED/34506485 (solo-consultazione); archived copy: https://metraipolis.com/documento/dc_fb5014961339 (Metraipolis archive dc_fb5014961339, sha256 8687b2423e608a2a0f4d94e98d6abd2d00a5d3b074ff7f7b39730be069ab6b52)
BibTeX
@misc{dcfb5014961339,
title = {Investors' exit timing of PPP projects based on escalation of commitment — Europe PMC PMID:34506485},
howpublished = {Europe PMC (en)},
url = {https://europepmc.org/article/MED/34506485},
note = {License solo-consultazione; archived copy https://metraipolis.com/documento/dc_fb5014961339; sha256 8687b2423e608a2a0f4d94e98d6abd2d00a5d3b074ff7f7b39730be069ab6b52},
year = {2026}
}Archived text
The text is not reproduced here: the archive holds it as solo-consultazione (consultation only, no republication). Read it at the original source: https://europepmc.org/article/MED/34506485. Agents can read the archived copy with the MCP tool read_document.