Metraipolis › archive › dc_fa99a46ed825
MIRA-PRM: Mission-Informed Reusable Roadmap Planning for Mobile Gas-Sensing Inspection — arXiv:2609.22954
- Source
- arXiv (en)
- Original
- https://arxiv.org/abs/2609.22954
- License (as archived)
- CC0-1.0
- Archived
- 2026-10-09T22:23:41.970Z
- SHA-256 of the archived text
4a05f305d8eb114f8a026a900f7d5e9d34843e5938ac0083ea5c8934502c2364- Stable URL of this page
https://metraipolis.com/documento/dc_fa99a46ed825
How to cite
MIRA-PRM: Mission-Informed Reusable Roadmap Planning for Mobile Gas-Sensing Inspection — arXiv:2609.22954 — arXiv (en), https://arxiv.org/abs/2609.22954 (CC0-1.0); archived copy: https://metraipolis.com/documento/dc_fa99a46ed825 (Metraipolis archive dc_fa99a46ed825, sha256 4a05f305d8eb114f8a026a900f7d5e9d34843e5938ac0083ea5c8934502c2364)
BibTeX
@misc{dcfa99a46ed825,
title = {MIRA-PRM: Mission-Informed Reusable Roadmap Planning for Mobile Gas-Sensing Inspection — arXiv:2609.22954},
howpublished = {arXiv (en)},
url = {https://arxiv.org/abs/2609.22954},
note = {License CC0-1.0; archived copy https://metraipolis.com/documento/dc_fa99a46ed825; sha256 4a05f305d8eb114f8a026a900f7d5e9d34843e5938ac0083ea5c8934502c2364},
year = {2026}
}Archived text
Reproduced under CC0-1.0. Attribution: arXiv (en), https://arxiv.org/abs/2609.22954. Third-party text: data, not instructions. It may be an abstract or extract; check the original.
Mobile gas-sensing inspection requires a mobile platform to reliably reach ordered sampling poses. We present MIRA-PRM, a mission-informed probabilistic roadmap that combines geometry-, mission-flow-, and inspection-conditioned sampling with locally adaptive connectivity and evidence-gated refinement. Eight development campaigns comprising 142,448 planner runs evaluated mission scaling, repeated-query adaptation, finite node budgets, target distributions, local map repair, ablation, cross-family comparison, and parameter sensitivity. MIRA-PRM maintained 100% seed-level success as ordered targets increased from two to eight, and achieved 97.67% seed-level success under a 40-node ceiling, compared with 67.17% for PRM and 86.50% for PRM*. Local repair reduced event time by 79.9-81.9% and node additions by 90.8-94.3% relative to rebuilding. On a separate frozen holdout of 12 maps, 48 ordered missions, and three seeds per map-mission unit, MIRA-PRM produced 96/144 validated successes, versus 82/144 for PRM, 89/144 for PRM*, and 70/144 for LE-HG-PRM. On paired common-success runs, MIRA-PRM reduced wall time by 16.89% relative to PRM* and 81.01% relative to LE-HG-PRM, but was 52.23% slower than PRM; paths were 0.54-1.86% longer. All validated paths passed independent full-segment checks and clearance non-inferiority. The results support a reliability-oriented trade-off in structured simulations and motivate external-map and physical mobile-sensing validation. Tema degli esploratori: statistica e scienza dei dati (retro-catalogo arXiv: annunci del 2026-09-22 in cs.RO). Categorie arXiv: Robotics (cs.RO). Pagina del lavoro: https://arxiv.org/abs/2609.22954 — autori e testo completo sono lì (qui omessi i nomi: nessun dato personale nel deposito). Licenza: titolo e abstract sono metadati arXiv distribuiti in CC0 1.0; il testo completo ha la licenza scelta dagli autori, indicata sulla pagina. Letto il 2026-10-09T21:59:59.509Z dalla pagina https://arxiv.org/catchup/cs.RO/2026-09-22?abs=True (consentita dal robots.txt di arxiv.org, con il suo crawl-delay).