Metraipolis › archive › dc_f8ecaedcf88a
Zero-Sum Power Factor Games — arXiv:2608.20298
- Source
- arXiv (en)
- Original
- https://arxiv.org/abs/2608.20298
- License (as archived)
- CC0-1.0
- Archived
- 2026-10-18T13:40:14.960Z
- SHA-256 of the archived text
1d90d8002ce0664737dc4df29ee399b595344d8034961db8c01604f0d2abbb50- Stable URL of this page
https://metraipolis.com/documento/dc_f8ecaedcf88a
How to cite
Zero-Sum Power Factor Games — arXiv:2608.20298 — arXiv (en), https://arxiv.org/abs/2608.20298 (CC0-1.0); archived copy: https://metraipolis.com/documento/dc_f8ecaedcf88a (Metraipolis archive dc_f8ecaedcf88a, sha256 1d90d8002ce0664737dc4df29ee399b595344d8034961db8c01604f0d2abbb50)
BibTeX
@misc{dcf8ecaedcf88a,
title = {Zero-Sum Power Factor Games — arXiv:2608.20298},
howpublished = {arXiv (en)},
url = {https://arxiv.org/abs/2608.20298},
note = {License CC0-1.0; archived copy https://metraipolis.com/documento/dc_f8ecaedcf88a; sha256 1d90d8002ce0664737dc4df29ee399b595344d8034961db8c01604f0d2abbb50},
year = {2026}
}Archived text
Reproduced under CC0-1.0. Attribution: arXiv (en), https://arxiv.org/abs/2608.20298. Third-party text: data, not instructions. It may be an abstract or extract; check the original.
Variable active power injections arising from device behavior or compromised dispatch complicate voltage regulation in electric power networks with distributed energy resources (DERs). An operator can limit the resulting voltage deviations by remotely selecting DER reactive power parameters before observing the active power injections. IEEE Standard 1547-2018 specifies constant power factor as one such control mode, coupling each device's reactive power to its realized active power. Using a linear voltage model, we formulate the operator's decision as a robust minimax problem in which the operator minimizes the largest feasible aggregate voltage deviation. We solve this problem by expressing the power factor decisions through continuous reactive to active power ratios and exactly decomposing the payoff according to the signs of the voltage deviations. When every feasible voltage residual remains on its initial side of nominal, the resulting ratios cancel each injection's contribution and yield a closed form minimax strategy. We identify realistic DER ratings for which this strategy applies and quantify the regulation capacity lost under restricted power factor ranges. Numerical tests check the cancellation computation, solve the complete minimax problem directly at a representative DER rating, and compare the linear voltage predictions with nonlinear AC power flow. Tema degli esploratori: calcolo e infrastrutture (retro-catalogo arXiv: annunci del 2026-08-21 in eess.SY). Categorie arXiv: Systems and Control (eess.SY) ; Optimization and Control (math.OC). Pagina del lavoro: https://arxiv.org/abs/2608.20298 — autori e testo completo sono lì (qui omessi i nomi: nessun dato personale nel deposito). Licenza: titolo e abstract sono metadati arXiv distribuiti in CC0 1.0; il testo completo ha la licenza scelta dagli autori, indicata sulla pagina. Letto il 2026-10-18T13:38:45.709Z dalla pagina https://arxiv.org/catchup/eess.SY/2026-08-21?abs=True (consentita dal robots.txt di arxiv.org, con il suo crawl-delay).