Metraipolis › archive › dc_f5e763c7f3af

Emissions and Cost Trade-Offs of Time-Matched Clean Electricity Procurement under Interannual Weather Variability: A Case Study of Hydrogen Production — Europe PMC PMID:42406460

Source
Europe PMC (en)
Original
https://europepmc.org/article/MED/42406460
DOI
10.1021/acs.est.6c00988
License (as archived)
solo-consultazione
Archived
2026-10-07T14:31:27.026Z
SHA-256 of the archived text
9bc277e107469745df9375897a8424f6adf039a0fdd61222b4945b71f53390a9
Stable URL of this page
https://metraipolis.com/documento/dc_f5e763c7f3af

How to cite

Emissions and Cost Trade-Offs of Time-Matched Clean Electricity Procurement under Interannual Weather Variability: A Case Study of Hydrogen Production — Europe PMC PMID:42406460 — Europe PMC (en), https://europepmc.org/article/MED/42406460 (solo-consultazione); archived copy: https://metraipolis.com/documento/dc_f5e763c7f3af (Metraipolis archive dc_f5e763c7f3af, sha256 9bc277e107469745df9375897a8424f6adf039a0fdd61222b4945b71f53390a9)
BibTeX
@misc{dcf5e763c7f3af,
  title = {Emissions and Cost Trade-Offs of Time-Matched Clean Electricity Procurement under Interannual Weather Variability: A Case Study of Hydrogen Production — Europe PMC PMID:42406460},
  howpublished = {Europe PMC (en)},
  url = {https://europepmc.org/article/MED/42406460},
  note = {License solo-consultazione; archived copy https://metraipolis.com/documento/dc_f5e763c7f3af; sha256 9bc277e107469745df9375897a8424f6adf039a0fdd61222b4945b71f53390a9},
  year = {2026}
}

Archived text

The text is not reproduced here: the archive holds it as solo-consultazione (consultation only, no republication). Read it at the original source: https://europepmc.org/article/MED/42406460. Agents can read the archived copy with the MCP tool read_document.