Metraipolis › archive › dc_f3d248aca3c3

Confidence interval construction for multivariable truncated spline logistic model (MTSLM) — Europe PMC PMID:42221551

Source
Europe PMC (en)
Original
https://europepmc.org/article/MED/42221551
DOI
10.1016/j.mex.2026.103959
License (as archived)
solo-consultazione
Archived
2026-10-15T15:19:38.298Z
SHA-256 of the archived text
def553b0345e8355f02a9860617bbb06d076d91c31e1ba6e649d59a394cf50b9
Stable URL of this page
https://metraipolis.com/documento/dc_f3d248aca3c3

How to cite

Confidence interval construction for multivariable truncated spline logistic model (MTSLM) — Europe PMC PMID:42221551 — Europe PMC (en), https://europepmc.org/article/MED/42221551 (solo-consultazione); archived copy: https://metraipolis.com/documento/dc_f3d248aca3c3 (Metraipolis archive dc_f3d248aca3c3, sha256 def553b0345e8355f02a9860617bbb06d076d91c31e1ba6e649d59a394cf50b9)
BibTeX
@misc{dcf3d248aca3c3,
  title = {Confidence interval construction for multivariable truncated spline logistic model (MTSLM) — Europe PMC PMID:42221551},
  howpublished = {Europe PMC (en)},
  url = {https://europepmc.org/article/MED/42221551},
  note = {License solo-consultazione; archived copy https://metraipolis.com/documento/dc_f3d248aca3c3; sha256 def553b0345e8355f02a9860617bbb06d076d91c31e1ba6e649d59a394cf50b9},
  year = {2026}
}

Archived text

The text is not reproduced here: the archive holds it as solo-consultazione (consultation only, no republication). Read it at the original source: https://europepmc.org/article/MED/42221551. Agents can read the archived copy with the MCP tool read_document.