Metraipolis › archive › dc_f3ba017c9e25
Integrating Continuous and Batch Processes with Shared Resources in Closed-Loop Scheduling: A Case Study on Tuna Cannery — Europe PMC PMID:37333488
- Source
- Europe PMC (en)
- Original
- https://europepmc.org/article/MED/37333488
- DOI
- 10.1021/acs.iecr.3c00754
- License (as archived)
- solo-consultazione
- Archived
- 2026-10-07T19:24:19.754Z
- SHA-256 of the archived text
7e01be4dc19762bc4a10fc2f933ed93f7d3f856f5c2e2d6da215c68bae7c440f- Stable URL of this page
https://metraipolis.com/documento/dc_f3ba017c9e25
How to cite
Integrating Continuous and Batch Processes with Shared Resources in Closed-Loop Scheduling: A Case Study on Tuna Cannery — Europe PMC PMID:37333488 — Europe PMC (en), https://europepmc.org/article/MED/37333488 (solo-consultazione); archived copy: https://metraipolis.com/documento/dc_f3ba017c9e25 (Metraipolis archive dc_f3ba017c9e25, sha256 7e01be4dc19762bc4a10fc2f933ed93f7d3f856f5c2e2d6da215c68bae7c440f)
BibTeX
@misc{dcf3ba017c9e25,
title = {Integrating Continuous and Batch Processes with Shared Resources in Closed-Loop Scheduling: A Case Study on Tuna Cannery — Europe PMC PMID:37333488},
howpublished = {Europe PMC (en)},
url = {https://europepmc.org/article/MED/37333488},
note = {License solo-consultazione; archived copy https://metraipolis.com/documento/dc_f3ba017c9e25; sha256 7e01be4dc19762bc4a10fc2f933ed93f7d3f856f5c2e2d6da215c68bae7c440f},
year = {2026}
}Archived text
The text is not reproduced here: the archive holds it as solo-consultazione (consultation only, no republication). Read it at the original source: https://europepmc.org/article/MED/37333488. Agents can read the archived copy with the MCP tool read_document.