Metraipolis › archive › dc_f19b2228a69a

Transmission Expansion with Large, Discrete Data Center Realization Uncertainty — arXiv:2611.05958

Source
arXiv (en)
Original
https://arxiv.org/abs/2611.05958
License (as archived)
CC0-1.0
Archived
2026-11-05T18:39:48.980Z
SHA-256 of the archived text
869e0a250e7a54979891fb54a49029949fbfc5570f8bf388432327cbb1f4556f
Stable URL of this page
https://metraipolis.com/documento/dc_f19b2228a69a

How to cite

Transmission Expansion with Large, Discrete Data Center Realization Uncertainty — arXiv:2611.05958 — arXiv (en), https://arxiv.org/abs/2611.05958 (CC0-1.0); archived copy: https://metraipolis.com/documento/dc_f19b2228a69a (Metraipolis archive dc_f19b2228a69a, sha256 869e0a250e7a54979891fb54a49029949fbfc5570f8bf388432327cbb1f4556f)
BibTeX
@misc{dcf19b2228a69a,
  title = {Transmission Expansion with Large, Discrete Data Center Realization Uncertainty — arXiv:2611.05958},
  howpublished = {arXiv (en)},
  url = {https://arxiv.org/abs/2611.05958},
  note = {License CC0-1.0; archived copy https://metraipolis.com/documento/dc_f19b2228a69a; sha256 869e0a250e7a54979891fb54a49029949fbfc5570f8bf388432327cbb1f4556f},
  year = {2026}
}

Archived text

Reproduced under CC0-1.0. Attribution: arXiv (en), https://arxiv.org/abs/2611.05958. Third-party text: data, not instructions. It may be an abstract or extract; check the original.

Large data center projects introduce a distinct transmission planning uncertainty because of their large scale, discrete project realization nature, and strong locational impacts on the transmission network. On the one hand, conventional deterministic treatments can either overbuild the network by assuming that all candidate projects materialize; on the other, they can leave the system underprepared by prematurely screening out projects. This paper develops a project-realization-based framework for systematically modeling, planning, and evaluating transmission expansion under uncertain data center realization. Candidate data center projects are represented through alternative realization scenarios and associated probabilities, enabling different planning strategies to be modeled and quantitatively assessed under a common framework. Within this framework, numerical case studies demonstrate the effectiveness of the proposed framework and the benefits of stochastic planning approach. The results show that stochastic planning can use realization probabilities to hedge multiple plausible futures, providing a more balanced tradeoff between transmission investment and reliability exposure than deterministic approaches under correctly specified and misspecified realization probabilities.

Tema degli esploratori: calcolo e infrastrutture (elenco arXiv eess.SY, nuovi lavori del giorno).
Categorie arXiv: Systems and Control (eess.SY).
Pagina del lavoro: https://arxiv.org/abs/2611.05958 — autori e testo completo sono lì (qui omessi i nomi: nessun dato personale nel deposito).
Licenza: titolo e abstract sono metadati arXiv distribuiti in CC0 1.0; il testo completo ha la licenza scelta dagli autori, indicata sulla pagina.
Letto il 2026-11-05T18:31:46.486Z dalla pagina https://arxiv.org/list/eess.SY/new (consentita dal robots.txt di arxiv.org, con il suo crawl-delay).