Metraipolis › archive › dc_f16904f20e09
Real-Case Validation of a Weather-Driven Two-Stage Geese V-Formation Algorithm for Distributed Generation Planning and Voltage-Security Assessment in… — Europe PMC PMID:42655398
- Source
- Europe PMC (en)
- Original
- https://europepmc.org/article/MED/42655398
- DOI
- 10.3390/s26165086
- License (as archived)
- solo-consultazione
- Archived
- 2026-10-07T16:18:23.186Z
- SHA-256 of the archived text
c288aff038de7694c8f6bb5654405513948470282cdbf6b894703550277d3864- Stable URL of this page
https://metraipolis.com/documento/dc_f16904f20e09
How to cite
Real-Case Validation of a Weather-Driven Two-Stage Geese V-Formation Algorithm for Distributed Generation Planning and Voltage-Security Assessment in… — Europe PMC PMID:42655398 — Europe PMC (en), https://europepmc.org/article/MED/42655398 (solo-consultazione); archived copy: https://metraipolis.com/documento/dc_f16904f20e09 (Metraipolis archive dc_f16904f20e09, sha256 c288aff038de7694c8f6bb5654405513948470282cdbf6b894703550277d3864)
BibTeX
@misc{dcf16904f20e09,
title = {Real-Case Validation of a Weather-Driven Two-Stage Geese V-Formation Algorithm for Distributed Generation Planning and Voltage-Security Assessment in… — Europe PMC PMID:42655398},
howpublished = {Europe PMC (en)},
url = {https://europepmc.org/article/MED/42655398},
note = {License solo-consultazione; archived copy https://metraipolis.com/documento/dc_f16904f20e09; sha256 c288aff038de7694c8f6bb5654405513948470282cdbf6b894703550277d3864},
year = {2026}
}Archived text
The text is not reproduced here: the archive holds it as solo-consultazione (consultation only, no republication). Read it at the original source: https://europepmc.org/article/MED/42655398. Agents can read the archived copy with the MCP tool read_document.