Readiness-Constrained Pre-Islanding Dispatch for Military Microgrids — arXiv:2610.40078
- Source
- arXiv (en)
- Original
- https://arxiv.org/abs/2610.40078
- License (as archived)
- CC0-1.0
- Archived
- 2026-11-01T02:32:28.724Z
- SHA-256 of the archived text
0d2fc51385a3df540af69a489291af28e7c79f4f0cd379bbef16cc7701955e63- Stable URL of this page
https://metraipolis.com/documento/dc_f00d2e252b3c
How to cite
Readiness-Constrained Pre-Islanding Dispatch for Military Microgrids — arXiv:2610.40078 — arXiv (en), https://arxiv.org/abs/2610.40078 (CC0-1.0); archived copy: https://metraipolis.com/documento/dc_f00d2e252b3c (Metraipolis archive dc_f00d2e252b3c, sha256 0d2fc51385a3df540af69a489291af28e7c79f4f0cd379bbef16cc7701955e63)
BibTeX
@misc{dcf00d2e252b3c,
title = {Readiness-Constrained Pre-Islanding Dispatch for Military Microgrids — arXiv:2610.40078},
howpublished = {arXiv (en)},
url = {https://arxiv.org/abs/2610.40078},
note = {License CC0-1.0; archived copy https://metraipolis.com/documento/dc_f00d2e252b3c; sha256 0d2fc51385a3df540af69a489291af28e7c79f4f0cd379bbef16cc7701955e63},
year = {2026}
}Archived text
Reproduced under CC0-1.0. Attribution: arXiv (en), https://arxiv.org/abs/2610.40078. Third-party text: data, not instructions. It may be an abstract or extract; check the original.
Military installation energy readiness depends on having sufficient resources to sustain mission-critical loads throughout a prolonged utility outage. This paper develops a method to help operators manage energy resources during normal grid-connected operation while preserving islanded readiness. A robust viability kernel identifies combinations of battery energy, fuel, and load-shifting capability sufficient to sustain critical load under uncertain demand and photovoltaic generation. A probability bound translates stochastic generator start failures and recovery into a deterministic generator count selected to meet a specified availability requirement at islanding. Case studies for a fourteen-day islanding requirement at 0.999 islanding-entry availability show that advance warning of an outage can be used to prepare resources to meet a higher readiness requirement before islanding begins. The case studies further demonstrate that economic-only operation and the evaluated fixed battery reserve policy can fail to sustain critical load for the required duration, whereas enforcing the resource-dependent requirement preserves readiness at a modest increase in modeled grid-connected operating cost. These results demonstrate how active resource management can preserve long-duration energy readiness. The framework also helps commanders understand how readiness changes with operating conditions, even when the available resources remain the same. Tema degli esploratori: matematica e informatica teorica (elenco arXiv math.OC, nuovi lavori del giorno). Categorie arXiv: Systems and Control (eess.SY) ; Optimization and Control (math.OC). Pagina del lavoro: https://arxiv.org/abs/2610.40078 — autori e testo completo sono lì (qui omessi i nomi: nessun dato personale nel deposito). Licenza: titolo e abstract sono metadati arXiv distribuiti in CC0 1.0; il testo completo ha la licenza scelta dagli autori, indicata sulla pagina. Letto il 2026-11-01T02:14:28.355Z dalla pagina https://arxiv.org/list/math.OC/new (consentita dal robots.txt di arxiv.org, con il suo crawl-delay).