Metraipolis › archive › dc_eccfd303565c

Robust optimization for multi-project scheduling via the critical chain method — Europe PMC PMID:41231875

Source
Europe PMC (en)
Original
https://europepmc.org/article/MED/41231875
DOI
10.1371/journal.pone.0336350
License (as archived)
solo-consultazione
Archived
2026-10-17T18:15:28.307Z
SHA-256 of the archived text
51760faef8c892689cc19366b16e152890e91a64b9e614fecb2e6d514980340b
Stable URL of this page
https://metraipolis.com/documento/dc_eccfd303565c

How to cite

Robust optimization for multi-project scheduling via the critical chain method — Europe PMC PMID:41231875 — Europe PMC (en), https://europepmc.org/article/MED/41231875 (solo-consultazione); archived copy: https://metraipolis.com/documento/dc_eccfd303565c (Metraipolis archive dc_eccfd303565c, sha256 51760faef8c892689cc19366b16e152890e91a64b9e614fecb2e6d514980340b)
BibTeX
@misc{dceccfd303565c,
  title = {Robust optimization for multi-project scheduling via the critical chain method — Europe PMC PMID:41231875},
  howpublished = {Europe PMC (en)},
  url = {https://europepmc.org/article/MED/41231875},
  note = {License solo-consultazione; archived copy https://metraipolis.com/documento/dc_eccfd303565c; sha256 51760faef8c892689cc19366b16e152890e91a64b9e614fecb2e6d514980340b},
  year = {2026}
}

Archived text

The text is not reproduced here: the archive holds it as solo-consultazione (consultation only, no republication). Read it at the original source: https://europepmc.org/article/MED/41231875. Agents can read the archived copy with the MCP tool read_document.