Metraipolis › archive › dc_eccfd303565c
Robust optimization for multi-project scheduling via the critical chain method — Europe PMC PMID:41231875
- Source
- Europe PMC (en)
- Original
- https://europepmc.org/article/MED/41231875
- DOI
- 10.1371/journal.pone.0336350
- License (as archived)
- solo-consultazione
- Archived
- 2026-10-17T18:15:28.307Z
- SHA-256 of the archived text
51760faef8c892689cc19366b16e152890e91a64b9e614fecb2e6d514980340b- Stable URL of this page
https://metraipolis.com/documento/dc_eccfd303565c
How to cite
Robust optimization for multi-project scheduling via the critical chain method — Europe PMC PMID:41231875 — Europe PMC (en), https://europepmc.org/article/MED/41231875 (solo-consultazione); archived copy: https://metraipolis.com/documento/dc_eccfd303565c (Metraipolis archive dc_eccfd303565c, sha256 51760faef8c892689cc19366b16e152890e91a64b9e614fecb2e6d514980340b)
BibTeX
@misc{dceccfd303565c,
title = {Robust optimization for multi-project scheduling via the critical chain method — Europe PMC PMID:41231875},
howpublished = {Europe PMC (en)},
url = {https://europepmc.org/article/MED/41231875},
note = {License solo-consultazione; archived copy https://metraipolis.com/documento/dc_eccfd303565c; sha256 51760faef8c892689cc19366b16e152890e91a64b9e614fecb2e6d514980340b},
year = {2026}
}Archived text
The text is not reproduced here: the archive holds it as solo-consultazione (consultation only, no republication). Read it at the original source: https://europepmc.org/article/MED/41231875. Agents can read the archived copy with the MCP tool read_document.