Regime-Dependent Value of CVaR in Preventive Maintenance Scheduling under RUL Uncertainty — arXiv:2609.33988

Source
arXiv (en)
Original
https://arxiv.org/abs/2609.33988
License (as archived)
CC0-1.0
Archived
2026-10-08T01:34:11.969Z
SHA-256 of the archived text
c6b3efe2728d8d9f9ae729508bfbdfde0b9cf62d3eef68e335a50f320f243747
Stable URL of this page
https://metraipolis.com/documento/dc_e8a7bd45b382

How to cite

Regime-Dependent Value of CVaR in Preventive Maintenance Scheduling under RUL Uncertainty — arXiv:2609.33988 — arXiv (en), https://arxiv.org/abs/2609.33988 (CC0-1.0); archived copy: https://metraipolis.com/documento/dc_e8a7bd45b382 (Metraipolis archive dc_e8a7bd45b382, sha256 c6b3efe2728d8d9f9ae729508bfbdfde0b9cf62d3eef68e335a50f320f243747)
BibTeX
@misc{dce8a7bd45b382,
  title = {Regime-Dependent Value of CVaR in Preventive Maintenance Scheduling under RUL Uncertainty — arXiv:2609.33988},
  howpublished = {arXiv (en)},
  url = {https://arxiv.org/abs/2609.33988},
  note = {License CC0-1.0; archived copy https://metraipolis.com/documento/dc_e8a7bd45b382; sha256 c6b3efe2728d8d9f9ae729508bfbdfde0b9cf62d3eef68e335a50f320f243747},
  year = {2026}
}

Archived text

Reproduced under CC0-1.0. Attribution: arXiv (en), https://arxiv.org/abs/2609.33988. Third-party text: data, not instructions. It may be an abstract or extract; check the original.

We study preventive-maintenance scheduling for a small fleet when several assets compete for a limited number of maintenance slots and their remaining useful lives (RULs) are uncertain. The planning horizon is divided into discrete periods; each asset may be maintained at most once, and at most $K$ assets may be maintained in any one period. Future usage and RUL errors are represented by scenarios. We compare a risk-neutral policy that minimizes expected cost with a risk-aware policy that minimizes expected cost plus conditional value-at-risk (CVaR), where $\operatorname{CVaR}_{0.90}$ is the mean cost among the worst 10\% of scenarios. Both policies are solved exactly by enumerating all capacity-feasible schedules. A $3\times5$ experiment combines capacities $K=1,2,3$ with five increasing levels of RUL uncertainty, with ten paired replications for each combination. The risk-aware policy provides its largest benefit when RUL uncertainty is low-to-moderate and more than one maintenance action can be executed per period. In the best observed case, it reduces CVaR by 13.4\% with an expected-cost increase of only 0.2 relative cost units. At high uncertainty, the benefit becomes negligible and the two policies can select identical schedules. The results show that risk-aware scheduling creates operational value only when prognostic information is sufficiently informative and the maintenance system has enough flexibility to act on it.

Tema degli esploratori: calcolo e infrastrutture (retro-catalogo arXiv: annunci del 2026-09-29 in eess.SY).
Categorie arXiv: Systems and Control (eess.SY).
Pagina del lavoro: https://arxiv.org/abs/2609.33988 — autori e testo completo sono lì (qui omessi i nomi: nessun dato personale nel deposito).
Licenza: titolo e abstract sono metadati arXiv distribuiti in CC0 1.0; il testo completo ha la licenza scelta dagli autori, indicata sulla pagina.
Letto il 2026-10-08T01:10:47.834Z dalla pagina https://arxiv.org/catchup/eess.SY/2026-09-29?abs=True (consentita dal robots.txt di arxiv.org, con il suo crawl-delay).