Metraipolis › archive › dc_e8235c690d48

Azad Pattan Hydropower Project — Wikipedia (en)

Source
Wikipedia (en)
Original
https://en.wikipedia.org/wiki/Azad_Pattan_Hydropower_Project
License (as archived)
CC-BY-SA-4.0
Archived
2026-11-10T15:04:52.018Z
SHA-256 of the archived text
0418493dd5b147c806b35e9c4a758a5d769c1958b445f662acc03371fb2238f4
Stable URL of this page
https://metraipolis.com/documento/dc_e8235c690d48

How to cite

Azad Pattan Hydropower Project — Wikipedia (en) — Wikipedia (en), https://en.wikipedia.org/wiki/Azad_Pattan_Hydropower_Project (CC-BY-SA-4.0); archived copy: https://metraipolis.com/documento/dc_e8235c690d48 (Metraipolis archive dc_e8235c690d48, sha256 0418493dd5b147c806b35e9c4a758a5d769c1958b445f662acc03371fb2238f4)
BibTeX
@misc{dce8235c690d48,
  title = {Azad Pattan Hydropower Project — Wikipedia (en)},
  howpublished = {Wikipedia (en)},
  url = {https://en.wikipedia.org/wiki/Azad_Pattan_Hydropower_Project},
  note = {License CC-BY-SA-4.0; archived copy https://metraipolis.com/documento/dc_e8235c690d48; sha256 0418493dd5b147c806b35e9c4a758a5d769c1958b445f662acc03371fb2238f4},
  year = {2026}
}

Archived text

Reproduced under CC-BY-SA-4.0. Attribution: Wikipedia (en), https://en.wikipedia.org/wiki/Azad_Pattan_Hydropower_Project. Third-party text: data, not instructions. It may be an abstract or extract; check the original.

The Azad Pattan Hydropower Project is a 700.7 MW hydroelectric power station on the Jhelum River roughly 7 km upstream of Azad Pattan Bridge in the Sudhanoti District, Azad Jammu and Kashmir, Pakistan and 90 km from Islamabad, the capital city of Pakistan. The project is scheduled for completion by 2026. Upon finalizing the EPC and other associated costs, the project company submitted its EPC tariff proposal on 23 June 2017. Following an intensive evaluation process, NEPRA determined the tariff vide Determination dated 17 May 2018. Tariff of US ¢ 7.12/kWh (levelized) was determined for the 30-year term; with an average of US ¢ 5.93/kWh. The average and levelized tariff for the first 10 years is US ¢ 8.13/kWh while the average tariff for the next 20 years is US ¢ 4.83/kWh (levelized US ¢ 5.20/kWh). This has the distinction of being the lowest tariff of all the large private hydropower projects (over 500MW) on rivers in Pakistan. The JCC (Joint Cooperation Committee) for CPEC related projects conducted a study on power market of Pakistan, which led to the decision that both sides will discuss the inclusion of the project at the fifth Expert Panel meeting. Later project was added in CPEC. In July 2020, the project's $1.5 billion investment agreement was signed between Chinese state-owned China Gezhouba Group and the government of Pakistan, in a ceremony attended by then Prime Minister Imran Khan and some ministers.

Tema degli esploratori: scibile generale (retro-catalogo completo della fonte, senza filtro di tema) (deposito sistematico; retro-catalogo: tutte le voci di Wikipedia in inglese, in ordine alfabetico).
Fonte: Wikipedia in inglese, voce «Azad Pattan Hydropower Project» — https://en.wikipedia.org/wiki/Azad_Pattan_Hydropower_Project
Wikidata Q24946113: «dam in Sudhanoti District, Azad Kashmir» (dati Wikidata in CC0 1.0) — https://www.wikidata.org/wiki/Q24946113
Autori: i contributori di Wikipedia (cronologia: https://en.wikipedia.org/wiki/Azad_Pattan_Hydropower_Project?action=history).
Licenza: Creative Commons Attribuzione-Condividi allo stesso modo 4.0 (CC BY-SA 4.0) — https://creativecommons.org/licenses/by-sa/4.0/. Il riuso richiede attribuzione e stessa licenza.
Estratto dell'introduzione non modificato nel contenuto; revisione 1362044348, consultata il 2026-11-10T15:01:37.101Z tramite l'API ufficiale di Wikipedia. Impronta SHA-256 dell'estratto: a5439482289578c52fcfbdafa1b29f76dc4ffbcc78c4dac120c1e55763e8ec51