Metraipolis › archive › dc_e65696a77512

Dynamic Operational Reserve Margin Assessment from Risk-Constrained Unit Commitment States — arXiv:2609.03066

Source
arXiv (en)
Original
https://arxiv.org/abs/2609.03066
License (as archived)
CC0-1.0
Archived
2026-10-17T02:26:01.954Z
SHA-256 of the archived text
bb031eca81d5adae2d979a28c26e08e20c6f8826c4f5e152a8802ed9c51b922a
Stable URL of this page
https://metraipolis.com/documento/dc_e65696a77512

How to cite

Dynamic Operational Reserve Margin Assessment from Risk-Constrained Unit Commitment States — arXiv:2609.03066 — arXiv (en), https://arxiv.org/abs/2609.03066 (CC0-1.0); archived copy: https://metraipolis.com/documento/dc_e65696a77512 (Metraipolis archive dc_e65696a77512, sha256 bb031eca81d5adae2d979a28c26e08e20c6f8826c4f5e152a8802ed9c51b922a)
BibTeX
@misc{dce65696a77512,
  title = {Dynamic Operational Reserve Margin Assessment from Risk-Constrained Unit Commitment States — arXiv:2609.03066},
  howpublished = {arXiv (en)},
  url = {https://arxiv.org/abs/2609.03066},
  note = {License CC0-1.0; archived copy https://metraipolis.com/documento/dc_e65696a77512; sha256 bb031eca81d5adae2d979a28c26e08e20c6f8826c4f5e152a8802ed9c51b922a},
  year = {2026}
}

Archived text

Reproduced under CC0-1.0. Attribution: arXiv (en), https://arxiv.org/abs/2609.03066. Third-party text: data, not instructions. It may be an abstract or extract; check the original.

We propose Dynamic Reserve Margin (DRM) as a time-varying operational adequacy metric derived from risk-constrained unit commitment (RCUC) states. DRM quantifies reserve adequacy using the additional generation capacity that committed generators can provide within a 5-minute response window relative to uncertainty and contingency reserve requirements. We introduce a complementary Reserve Risk Envelope (RRE) metric to quantify operational reserve headroom in directly interpretable MW terms. A low-margin duration metric is further developed to quantify the persistence of reserve stress over an operating horizon. We use an IEEE 14-bus example to illustrate these concepts, followed by large-scale RCUC case studies under multiple operating scenarios. Results demonstrate that reserve requirements and ramp-accessible reserve capability can vary substantially across operating conditions, and that commitment decisions adapt to maintain reserve adequacy under changing system conditions. The proposed DRM and RRE metrics provide an interpretable operational characterization of reserve adequacy, reveal reserve accessibility and stress persistence that are not captured by conventional reserve margin metrics.

Tema degli esploratori: statistica e scienza dei dati (retro-catalogo arXiv: annunci del 2026-09-04 in stat.AP).
Categorie arXiv: Systems and Control (eess.SY) ; Applications (stat.AP).
Pagina del lavoro: https://arxiv.org/abs/2609.03066 — autori e testo completo sono lì (qui omessi i nomi: nessun dato personale nel deposito).
Licenza: titolo e abstract sono metadati arXiv distribuiti in CC0 1.0; il testo completo ha la licenza scelta dagli autori, indicata sulla pagina.
Letto il 2026-10-17T02:04:40.025Z dalla pagina https://arxiv.org/catchup/stat.AP/2026-09-04?abs=True (consentita dal robots.txt di arxiv.org, con il suo crawl-delay).