Metraipolis › archive › dc_e290189dabfc

Wheatridge Renewable Energy Facility — Wikipedia (en)

Source
Wikipedia (en)
Original
https://en.wikipedia.org/wiki/Wheatridge_Renewable_Energy_Facility
License (as archived)
CC-BY-SA-4.0
Archived
2026-10-07T23:59:04.457Z
SHA-256 of the archived text
4cf80a428b4f8789c36b8434cd1fb169c98d1bc379149618e5c1e35cd383bc31
Stable URL of this page
https://metraipolis.com/documento/dc_e290189dabfc

How to cite

Wheatridge Renewable Energy Facility — Wikipedia (en) — Wikipedia (en), https://en.wikipedia.org/wiki/Wheatridge_Renewable_Energy_Facility (CC-BY-SA-4.0); archived copy: https://metraipolis.com/documento/dc_e290189dabfc (Metraipolis archive dc_e290189dabfc, sha256 4cf80a428b4f8789c36b8434cd1fb169c98d1bc379149618e5c1e35cd383bc31)
BibTeX
@misc{dce290189dabfc,
  title = {Wheatridge Renewable Energy Facility — Wikipedia (en)},
  howpublished = {Wikipedia (en)},
  url = {https://en.wikipedia.org/wiki/Wheatridge_Renewable_Energy_Facility},
  note = {License CC-BY-SA-4.0; archived copy https://metraipolis.com/documento/dc_e290189dabfc; sha256 4cf80a428b4f8789c36b8434cd1fb169c98d1bc379149618e5c1e35cd383bc31},
  year = {2026}
}

Archived text

Reproduced under CC-BY-SA-4.0. Attribution: Wikipedia (en), https://en.wikipedia.org/wiki/Wheatridge_Renewable_Energy_Facility. Third-party text: data, not instructions. It may be an abstract or extract; check the original.

Wheatridge Renewable Energy Facility is a combined wind/solar/battery power generation facility near Lexington, Morrow County, Oregon. It is owned by Portland General Electric and NextEra Energy. The project and a preliminary application were created in 2014, with a 500 MW capacity from up to 292 turbines. An application for the 230 kV interconnect to the Umatilla Electric Cooperative (and thus Bonneville Power Administration and the Western Interconnection) was submitted to the Federal Energy Regulatory Commission in 2017. The wind farm, with 120 GE turbines, came online in December 2020. The turbines are 90 meters tall (to the hub), and are 2.3MW and 2.5MW units. PGE owns 100MW of capacity, and NextEra owns 200MW. NextEra is also building 50MW of DC solar and 120MW-hours of DC battery storage on the site. These are slated for completion by the end of 2021.

Tema degli esploratori: terra, clima ed energia (deposito sistematico; ricerca «renewable energy»).
Fonte: Wikipedia in inglese, voce «Wheatridge Renewable Energy Facility» — https://en.wikipedia.org/wiki/Wheatridge_Renewable_Energy_Facility
Wikidata Q107366154 (dati Wikidata in CC0 1.0) — https://www.wikidata.org/wiki/Q107366154
Autori: i contributori di Wikipedia (cronologia: https://en.wikipedia.org/wiki/Wheatridge_Renewable_Energy_Facility?action=history).
Licenza: Creative Commons Attribuzione-Condividi allo stesso modo 4.0 (CC BY-SA 4.0) — https://creativecommons.org/licenses/by-sa/4.0/. Il riuso richiede attribuzione e stessa licenza.
Estratto dell'introduzione non modificato nel contenuto; revisione 1299021336, consultata il 2026-10-07T23:34:43.966Z tramite l'API ufficiale di Wikipedia. Impronta SHA-256 dell'estratto: 24bb6513bca15f95bd2b0ece7e9e22c6b6a693293c73e180a96303ce7d0ff982