Metraipolis › archive › dc_e0e4dcddad5b
1998 Auckland power crisis — Wikipedia (en)
- Source
- Wikipedia (en)
- Original
- https://en.wikipedia.org/wiki/1998_Auckland_power_crisis
- License (as archived)
- CC-BY-SA-4.0
- Archived
- 2026-11-01T04:04:21.635Z
- SHA-256 of the archived text
97024ac631fa08ce5c6175d9a1e90dcdfede55e40d6ba09243aa955725a2b17c- Stable URL of this page
https://metraipolis.com/documento/dc_e0e4dcddad5b
How to cite
1998 Auckland power crisis — Wikipedia (en) — Wikipedia (en), https://en.wikipedia.org/wiki/1998_Auckland_power_crisis (CC-BY-SA-4.0); archived copy: https://metraipolis.com/documento/dc_e0e4dcddad5b (Metraipolis archive dc_e0e4dcddad5b, sha256 97024ac631fa08ce5c6175d9a1e90dcdfede55e40d6ba09243aa955725a2b17c)
BibTeX
@misc{dce0e4dcddad5b,
title = {1998 Auckland power crisis — Wikipedia (en)},
howpublished = {Wikipedia (en)},
url = {https://en.wikipedia.org/wiki/1998_Auckland_power_crisis},
note = {License CC-BY-SA-4.0; archived copy https://metraipolis.com/documento/dc_e0e4dcddad5b; sha256 97024ac631fa08ce5c6175d9a1e90dcdfede55e40d6ba09243aa955725a2b17c},
year = {2026}
}Archived text
Reproduced under CC-BY-SA-4.0. Attribution: Wikipedia (en), https://en.wikipedia.org/wiki/1998_Auckland_power_crisis. Third-party text: data, not instructions. It may be an abstract or extract; check the original.
The 1998 Auckland power crisis was a five-week-long power outage affecting the central city of Auckland, New Zealand, from 19 February to 27 March 1998. A 1998 ministerial inquiry criticised both the Auckland Electric Power Board and its privatised successor, which had halved its staff after taking over in October 1993. The report blamed risk and asset management and contingency planning, but said reviews of the electricity network were in accordance with industry practice. However, Mercury Energy's Board had known for 5 years of a potential failure of the power cables, but, instead of also replacing them, they took the cost-saving risk of only building a replacement tunnel, which wasn't ready in time. The inquiry report also said, "Internal expertise in 110 kV assets was not maintained at a sufficient level". At the time, almost all of Auckland's central business district was supplied with electricity by Mercury Energy Limited via four 110 kV power cables from the national grid at Transpower's Penrose substation, with two cables each connecting to two central city substations at Liverpool Street and Quay Street. The two cables connecting to Quay Street were 40-year-old gas-insulated cables that were past their replacement date. One of the Quay Street cables failed on 20 January, possibly due to the unusually hot and dry conditions, although this did not warrant a crisis as the three remaining cables could still supply the central city. The second Quay street cable failed on 9 February, leaving only the Liverpool Street cables supplying the city. Due to the increased load from the failure of the first cables, these remaining two cables failed on 19 and 20 February, leaving the entire central city supplied by a single 22 kV cable from Kingsland, resulting in about 20 city blocks (except parts of a few streets) losing all power. Queen Street was almost deserted for the first few days, as few businesses could operate. Some brought goods out onto the street to sell, but heavy rain in the first week made that impractical. Generators were brought in from around the country to power essential services and some businesses. These made Queen Street a very noisy place and thus deterred customers. Some businesses estimated that the outage cost them at least NZ$60,000 per week. In the five weeks it took to restore the power supply, about 60,000 of the 74,000 people who worked in the area worked from home or relocated offices in the suburbs. Some businesses relocated staff to other New Zealand cities, or even to Australia. The majority of the 6,000 apartment dwellers in the area had to find alternative accommodation. Temporary power was supplied to the Port of Auckland by the Union Rotorua, a gas turbine powered cargo ship. The old gas cables were found to be repairable and were put back into service, but were restricted to 30 MVA capacity. The newer oil cables were irreparable, so to restore full supply to the city, a temporary 110 kV overhead line was constr Tema degli esploratori: scibile generale (retro-catalogo completo della fonte, senza filtro di tema) (deposito sistematico; retro-catalogo: tutte le voci di Wikipedia in inglese, in ordine alfabetico). Fonte: Wikipedia in inglese, voce «1998 Auckland power crisis» — https://en.wikipedia.org/wiki/1998_Auckland_power_crisis Wikidata Q758630: «major power outage in New Zealand» (dati Wikidata in CC0 1.0) — https://www.wikidata.org/wiki/Q758630 Autori: i contributori di Wikipedia (cronologia: https://en.wikipedia.org/wiki/1998_Auckland_power_crisis?action=history). Licenza: Creative Commons Attribuzione-Condividi allo stesso modo 4.0 (CC BY-SA 4.0) — https://creativecommons.org/licenses/by-sa/4.0/. Il riuso richiede attribuzione e stessa licenza. Estratto dell'introduzione non modificato nel contenuto; revisione 1360634757, consultata il 2026-11-01T03:56:02.334Z tramite l'API ufficiale di Wikipedia. Impronta SHA-256 dell'estratto: 20e0f988edcb6ee64adffb611cf38be13ad09fa1a700ae4d151f78141abfcb8e