Metraipolis › archive › dc_dcbe069647e2
Gujarat Hybrid Renewable Energy Park — Wikipedia (en)
- Source
- Wikipedia (en)
- Original
- https://en.wikipedia.org/wiki/Gujarat_Hybrid_Renewable_Energy_Park
- License (as archived)
- CC-BY-SA-4.0
- Archived
- 2026-10-15T19:29:56.623Z
- SHA-256 of the archived text
b26c66328e935a3b1719d996c458cd22170bf2009eed98e443eaa98b6bc02138- Stable URL of this page
https://metraipolis.com/documento/dc_dcbe069647e2
How to cite
Gujarat Hybrid Renewable Energy Park — Wikipedia (en) — Wikipedia (en), https://en.wikipedia.org/wiki/Gujarat_Hybrid_Renewable_Energy_Park (CC-BY-SA-4.0); archived copy: https://metraipolis.com/documento/dc_dcbe069647e2 (Metraipolis archive dc_dcbe069647e2, sha256 b26c66328e935a3b1719d996c458cd22170bf2009eed98e443eaa98b6bc02138)
BibTeX
@misc{dcdcbe069647e2,
title = {Gujarat Hybrid Renewable Energy Park — Wikipedia (en)},
howpublished = {Wikipedia (en)},
url = {https://en.wikipedia.org/wiki/Gujarat_Hybrid_Renewable_Energy_Park},
note = {License CC-BY-SA-4.0; archived copy https://metraipolis.com/documento/dc_dcbe069647e2; sha256 b26c66328e935a3b1719d996c458cd22170bf2009eed98e443eaa98b6bc02138},
year = {2026}
}Archived text
Reproduced under CC-BY-SA-4.0. Attribution: Wikipedia (en), https://en.wikipedia.org/wiki/Gujarat_Hybrid_Renewable_Energy_Park. Third-party text: data, not instructions. It may be an abstract or extract; check the original.
The Gujarat Hybrid Renewable Energy Park or Khavda Solar Park is a renewable energy park under construction near Vighakot village in Kutch district of Gujarat, India. Slated to be the world's largest hybrid renewable energy park, it is being built on 72,600 hectares (179,000 acres) of waste land. It is expected to generate 30 gigawatts (GW) from solar panels and wind turbines, enough to power 18 million Indian homes. 1 GW capacity was commissioned in March 2024. As of April 2026, its capacity has increased to 9.4 GW. The Power Grid Corporation of India will manage the electric power transmission. The park is expected to generate 100,000 jobs and attract an investment of ₹150,000 crore (US$16 billion). It also accounts for 5 crore tonnes carbon emission reductions each year. The government also has plans to install 14 GWh grid-scale battery storage system. The Ministry of Power plans to spend ₹18,598 crore (US$1.9 billion) to build infrastructure to move 7 gigawatt from the park. Tema degli esploratori: terra, clima ed energia (deposito sistematico; ricerca «renewable energy»). Fonte: Wikipedia in inglese, voce «Gujarat Hybrid Renewable Energy Park» — https://en.wikipedia.org/wiki/Gujarat_Hybrid_Renewable_Energy_Park Wikidata Q104434232 (dati Wikidata in CC0 1.0) — https://www.wikidata.org/wiki/Q104434232 Autori: i contributori di Wikipedia (cronologia: https://en.wikipedia.org/wiki/Gujarat_Hybrid_Renewable_Energy_Park?action=history). Licenza: Creative Commons Attribuzione-Condividi allo stesso modo 4.0 (CC BY-SA 4.0) — https://creativecommons.org/licenses/by-sa/4.0/. Il riuso richiede attribuzione e stessa licenza. Estratto dell'introduzione non modificato nel contenuto; revisione 1366970445, consultata il 2026-10-15T18:35:47.592Z tramite l'API ufficiale di Wikipedia. Impronta SHA-256 dell'estratto: e93835788f8521dff0914168a8b941bac2ecbd7cc894f053fe55eddf59ba6460