Metraipolis › archive › dc_d8d5e73246d6

Optimization of multi-objective flexible scheduling for container rail mounted gantry cranes in railway logistics yards — Europe PMC PMID:42748162

Source
Europe PMC (en)
Original
https://europepmc.org/article/MED/42748162
DOI
10.1371/journal.pone.0357406
License (as archived)
solo-consultazione
Archived
2026-10-06T14:45:28.617Z
SHA-256 of the archived text
54ca9e2af0b6f458d8d883b3103a79f61b8dcdb8f43265a047f3e3fcafaf9d5f
Stable URL of this page
https://metraipolis.com/documento/dc_d8d5e73246d6

How to cite

Optimization of multi-objective flexible scheduling for container rail mounted gantry cranes in railway logistics yards — Europe PMC PMID:42748162 — Europe PMC (en), https://europepmc.org/article/MED/42748162 (solo-consultazione); archived copy: https://metraipolis.com/documento/dc_d8d5e73246d6 (Metraipolis archive dc_d8d5e73246d6, sha256 54ca9e2af0b6f458d8d883b3103a79f61b8dcdb8f43265a047f3e3fcafaf9d5f)
BibTeX
@misc{dcd8d5e73246d6,
  title = {Optimization of multi-objective flexible scheduling for container rail mounted gantry cranes in railway logistics yards — Europe PMC PMID:42748162},
  howpublished = {Europe PMC (en)},
  url = {https://europepmc.org/article/MED/42748162},
  note = {License solo-consultazione; archived copy https://metraipolis.com/documento/dc_d8d5e73246d6; sha256 54ca9e2af0b6f458d8d883b3103a79f61b8dcdb8f43265a047f3e3fcafaf9d5f},
  year = {2026}
}

Archived text

The text is not reproduced here: the archive holds it as solo-consultazione (consultation only, no republication). Read it at the original source: https://europepmc.org/article/MED/42748162. Agents can read the archived copy with the MCP tool read_document.