Metraipolis › archive › dc_d6b62f2eb595
Beyond the Grid: Cost, Carbon, and Capital Requirements of On-Site Power Technologies for AI Data Centers — arXiv:2608.08170
- Source
- arXiv (en)
- Original
- https://arxiv.org/abs/2608.08170
- License (as archived)
- CC0-1.0
- Archived
- 2026-10-19T09:43:50.709Z
- SHA-256 of the archived text
3c4c8b0736c4e9536bc8dcc2458d89359d101ec0146a6f52d1ff1de7997a69d5- Stable URL of this page
https://metraipolis.com/documento/dc_d6b62f2eb595
How to cite
Beyond the Grid: Cost, Carbon, and Capital Requirements of On-Site Power Technologies for AI Data Centers — arXiv:2608.08170 — arXiv (en), https://arxiv.org/abs/2608.08170 (CC0-1.0); archived copy: https://metraipolis.com/documento/dc_d6b62f2eb595 (Metraipolis archive dc_d6b62f2eb595, sha256 3c4c8b0736c4e9536bc8dcc2458d89359d101ec0146a6f52d1ff1de7997a69d5)
BibTeX
@misc{dcd6b62f2eb595,
title = {Beyond the Grid: Cost, Carbon, and Capital Requirements of On-Site Power Technologies for AI Data Centers — arXiv:2608.08170},
howpublished = {arXiv (en)},
url = {https://arxiv.org/abs/2608.08170},
note = {License CC0-1.0; archived copy https://metraipolis.com/documento/dc_d6b62f2eb595; sha256 3c4c8b0736c4e9536bc8dcc2458d89359d101ec0146a6f52d1ff1de7997a69d5},
year = {2026}
}Archived text
Reproduced under CC0-1.0. Attribution: arXiv (en), https://arxiv.org/abs/2608.08170. Third-party text: data, not instructions. It may be an abstract or extract; check the original.
Interconnection queues, not electricity prices, now govern where data centers can be built, and the standard levelized-cost comparison answers a question no developer faces: it assumes a load profile, freezes the grid price while modeling the demand that moves it, and quotes busbar costs a facility cannot buy. This paper evaluates nine on-site supply technologies against a delivered grid whose price is endogenous to projected data-center demand, on a complete-site basis that retains standby charges, with measured GPU training load, delivered fuel prices, production-pathway carbon, and statutory 45V and 48E incentive mechanics. Nothing beats the wire: gas combined cycle produces at 47 USD/MWh but costs about 114 USD per megawatt-hour of complete site energy against a 92 USD grid; four-hour storage is physically capped near 18 percent of annual energy and, charged at the margin, dirtier than the grid; hydrogen from grid-priced power fails on cost and carbon together. An investment inversion converts these findings into capital terms: conversion-hardware learning buys nothing, because free hardware still exceeds the grid for every low-carbon arm, while global electrolyser deployment on sited sub-20 USD/MWh power brings PEM hydrogen power to about 2.2 times the grid at 300 billion USD and 1.9 times at 1 trillion USD (2.7 and 2.3 for the hydrogen engine), with a carbon reduction of roughly 85 percent (6.8-fold) against grid-power production. Grid parity is not purchasable at any budget. On-site supply is an access and depth product; most current investment targets the wrong term. Tema degli esploratori: economia dei servizi IA (retro-catalogo arXiv: annunci del 2026-08-11 in econ.EM). Categorie arXiv: Econometrics (econ.EM) ; Image and Video Processing (eess.IV). Pagina del lavoro: https://arxiv.org/abs/2608.08170 — autori e testo completo sono lì (qui omessi i nomi: nessun dato personale nel deposito). Licenza: titolo e abstract sono metadati arXiv distribuiti in CC0 1.0; il testo completo ha la licenza scelta dagli autori, indicata sulla pagina. Letto il 2026-10-19T09:35:46.338Z dalla pagina https://arxiv.org/catchup/econ.EM/2026-08-11?abs=True (consentita dal robots.txt di arxiv.org, con il suo crawl-delay).