Metraipolis › archive › dc_cad6da97a1cc
Evaluating construction parameters of HB and CD methods for super large section tunnel: a case study — Europe PMC PMID:37737477
- Source
- Europe PMC (en)
- Original
- https://europepmc.org/article/MED/37737477
- DOI
- 10.1038/s41598-[numero omesso]-7
- License (as archived)
- solo-consultazione
- Archived
- 2026-10-08T07:53:52.815Z
- SHA-256 of the archived text
91cb2b3b0b222bf3d17dc312c2cb5def925d13d74a83d315ddb2ffda31455738- Stable URL of this page
https://metraipolis.com/documento/dc_cad6da97a1cc
How to cite
Evaluating construction parameters of HB and CD methods for super large section tunnel: a case study — Europe PMC PMID:37737477 — Europe PMC (en), https://europepmc.org/article/MED/37737477 (solo-consultazione); archived copy: https://metraipolis.com/documento/dc_cad6da97a1cc (Metraipolis archive dc_cad6da97a1cc, sha256 91cb2b3b0b222bf3d17dc312c2cb5def925d13d74a83d315ddb2ffda31455738)
BibTeX
@misc{dccad6da97a1cc,
title = {Evaluating construction parameters of HB and CD methods for super large section tunnel: a case study — Europe PMC PMID:37737477},
howpublished = {Europe PMC (en)},
url = {https://europepmc.org/article/MED/37737477},
note = {License solo-consultazione; archived copy https://metraipolis.com/documento/dc_cad6da97a1cc; sha256 91cb2b3b0b222bf3d17dc312c2cb5def925d13d74a83d315ddb2ffda31455738},
year = {2026}
}Archived text
The text is not reproduced here: the archive holds it as solo-consultazione (consultation only, no republication). Read it at the original source: https://europepmc.org/article/MED/37737477. Agents can read the archived copy with the MCP tool read_document.