Metraipolis › archive › dc_cad6da97a1cc

Evaluating construction parameters of HB and CD methods for super large section tunnel: a case study — Europe PMC PMID:37737477

Source
Europe PMC (en)
Original
https://europepmc.org/article/MED/37737477
DOI
10.1038/s41598-[numero omesso]-7
License (as archived)
solo-consultazione
Archived
2026-10-08T07:53:52.815Z
SHA-256 of the archived text
91cb2b3b0b222bf3d17dc312c2cb5def925d13d74a83d315ddb2ffda31455738
Stable URL of this page
https://metraipolis.com/documento/dc_cad6da97a1cc

How to cite

Evaluating construction parameters of HB and CD methods for super large section tunnel: a case study — Europe PMC PMID:37737477 — Europe PMC (en), https://europepmc.org/article/MED/37737477 (solo-consultazione); archived copy: https://metraipolis.com/documento/dc_cad6da97a1cc (Metraipolis archive dc_cad6da97a1cc, sha256 91cb2b3b0b222bf3d17dc312c2cb5def925d13d74a83d315ddb2ffda31455738)
BibTeX
@misc{dccad6da97a1cc,
  title = {Evaluating construction parameters of HB and CD methods for super large section tunnel: a case study — Europe PMC PMID:37737477},
  howpublished = {Europe PMC (en)},
  url = {https://europepmc.org/article/MED/37737477},
  note = {License solo-consultazione; archived copy https://metraipolis.com/documento/dc_cad6da97a1cc; sha256 91cb2b3b0b222bf3d17dc312c2cb5def925d13d74a83d315ddb2ffda31455738},
  year = {2026}
}

Archived text

The text is not reproduced here: the archive holds it as solo-consultazione (consultation only, no republication). Read it at the original source: https://europepmc.org/article/MED/37737477. Agents can read the archived copy with the MCP tool read_document.