Metraipolis › archive › dc_c9363bdbead6

Strategic and Grid-Aware Maintenance Planning of Offshore Wind Farms — arXiv:2609.00651

Source
arXiv (en)
Original
https://arxiv.org/abs/2609.00651
License (as archived)
CC0-1.0
Archived
2026-10-17T07:33:38.674Z
SHA-256 of the archived text
30535068a05becfff054df56fe79fb14a4b11801bab945c2b18933378205cf74
Stable URL of this page
https://metraipolis.com/documento/dc_c9363bdbead6

How to cite

Strategic and Grid-Aware Maintenance Planning of Offshore Wind Farms — arXiv:2609.00651 — arXiv (en), https://arxiv.org/abs/2609.00651 (CC0-1.0); archived copy: https://metraipolis.com/documento/dc_c9363bdbead6 (Metraipolis archive dc_c9363bdbead6, sha256 30535068a05becfff054df56fe79fb14a4b11801bab945c2b18933378205cf74)
BibTeX
@misc{dcc9363bdbead6,
  title = {Strategic and Grid-Aware Maintenance Planning of Offshore Wind Farms — arXiv:2609.00651},
  howpublished = {arXiv (en)},
  url = {https://arxiv.org/abs/2609.00651},
  note = {License CC0-1.0; archived copy https://metraipolis.com/documento/dc_c9363bdbead6; sha256 30535068a05becfff054df56fe79fb14a4b11801bab945c2b18933378205cf74},
  year = {2026}
}

Archived text

Reproduced under CC0-1.0. Attribution: arXiv (en), https://arxiv.org/abs/2609.00651. Third-party text: data, not instructions. It may be an abstract or extract; check the original.

Wind turbines require regular maintenance and the resulting costs are a substantial component of a wind farm's cost of electricity production. As a result, there has been ongoing interest in improving wind turbine maintenance scheduling to find an optimal balance between maintenance costs and the risk of failure or unplanned repairs. What remains understudied is the opportunity for wind farms to schedule maintenance in the context of grid conditions and electricity market clearing. This paper contributes to closing this gap by modeling and studying wind farm maintenance planning in a grid and electricity market context. We also review current U.S. practice of wind farm maintenance scheduling, which motivates this paper and its models. Our focus is the derivation of a strategic maintenance planning problem, alongside an efficient solution approach, in which the wind farm operator aims to submit a derated wind farm capacity such that the resulting market clearing and electricity prices maximize its profit while ensuring that all required maintenance can be performed. We derive and study both deterministic and stochastic versions of the model, with the latter considering environmental and operational uncertainties. We conduct numerical experiments using the IEEE RTS 96-bus testbed with real-world offshore wind farm data and investigate the roles of farm and turbine size, as well as forecast quality. We observe an alignment between strategic and grid-serving maintenance planning and find that wind farms can improve their bottom line with low impact on system costs.

Tema degli esploratori: calcolo e infrastrutture (retro-catalogo arXiv: annunci del 2026-09-02 in eess.SY).
Categorie arXiv: Systems and Control (eess.SY).
Pagina del lavoro: https://arxiv.org/abs/2609.00651 — autori e testo completo sono lì (qui omessi i nomi: nessun dato personale nel deposito).
Licenza: titolo e abstract sono metadati arXiv distribuiti in CC0 1.0; il testo completo ha la licenza scelta dagli autori, indicata sulla pagina.
Letto il 2026-10-17T07:23:10.008Z dalla pagina https://arxiv.org/catchup/eess.SY/2026-09-02?abs=True (consentita dal robots.txt di arxiv.org, con il suo crawl-delay).