Metraipolis › archive › dc_c30d756a4177

Time to AC-t: When AC-transmission changes capacity expansion planning — arXiv:2611.04088

Source
arXiv (en)
Original
https://arxiv.org/abs/2611.04088
License (as archived)
CC0-1.0
Archived
2026-11-04T12:45:24.420Z
SHA-256 of the archived text
06de2d1678decaed9cd869e70c206ad8a38d13a81ed89cff5fbe0648ee1d112c
Stable URL of this page
https://metraipolis.com/documento/dc_c30d756a4177

How to cite

Time to AC-t: When AC-transmission changes capacity expansion planning — arXiv:2611.04088 — arXiv (en), https://arxiv.org/abs/2611.04088 (CC0-1.0); archived copy: https://metraipolis.com/documento/dc_c30d756a4177 (Metraipolis archive dc_c30d756a4177, sha256 06de2d1678decaed9cd869e70c206ad8a38d13a81ed89cff5fbe0648ee1d112c)
BibTeX
@misc{dcc30d756a4177,
  title = {Time to AC-t: When AC-transmission changes capacity expansion planning — arXiv:2611.04088},
  howpublished = {arXiv (en)},
  url = {https://arxiv.org/abs/2611.04088},
  note = {License CC0-1.0; archived copy https://metraipolis.com/documento/dc_c30d756a4177; sha256 06de2d1678decaed9cd869e70c206ad8a38d13a81ed89cff5fbe0648ee1d112c},
  year = {2026}
}

Archived text

Reproduced under CC0-1.0. Attribution: arXiv (en), https://arxiv.org/abs/2611.04088. Third-party text: data, not instructions. It may be an abstract or extract; check the original.

Capacity expansion models often dramatically simplify the physics of how power flows through a transmission network in order to preserve computational tractability. However, with the rapid growth of electrification, large loads, renewables, and storage, increased realism in planning future grids is imperative. We extend the open-source capacity expansion model GenX with AC optimal power flow physics, and analyze generation, storage, and transmission investment decisions for 20-zone, hourly models of Germany and Texas. We compare our results against those using two common approximations, the transport model and DC optimal power flow. We find that total costs and emissions largely agree across all formulations. However, we find substantial differences in outputs related to transmission, generation siting, storage, and reactive-power support between the approximate formulations and the true AC physics formulation. We identify where AC physics changes planning decisions and discuss how to potentially capture these effects without the full computational cost.

Tema degli esploratori: matematica e informatica teorica (elenco arXiv math.OC, nuovi lavori del giorno).
Categorie arXiv: Systems and Control (eess.SY) ; Optimization and Control (math.OC); Physics and Society (physics.soc-ph).
Pagina del lavoro: https://arxiv.org/abs/2611.04088 — autori e testo completo sono lì (qui omessi i nomi: nessun dato personale nel deposito).
Licenza: titolo e abstract sono metadati arXiv distribuiti in CC0 1.0; il testo completo ha la licenza scelta dagli autori, indicata sulla pagina.
Letto il 2026-11-04T12:31:32.271Z dalla pagina https://arxiv.org/list/math.OC/new (consentita dal robots.txt di arxiv.org, con il suo crawl-delay).