Metraipolis › archive › dc_bf172f66ee93
3 Line (Sound Transit) — Wikipedia (en)
- Source
- Wikipedia (en)
- Original
- https://en.wikipedia.org/wiki/3_Line_(Sound_Transit)
- License (as archived)
- CC-BY-SA-4.0
- Archived
- 2026-11-06T15:19:40.297Z
- SHA-256 of the archived text
8ff2eaec99e46fb38c90cc375be985cf49214787fba5a04b46dd6a78daa5bda8- Stable URL of this page
https://metraipolis.com/documento/dc_bf172f66ee93
How to cite
3 Line (Sound Transit) — Wikipedia (en) — Wikipedia (en), https://en.wikipedia.org/wiki/3_Line_(Sound_Transit) (CC-BY-SA-4.0); archived copy: https://metraipolis.com/documento/dc_bf172f66ee93 (Metraipolis archive dc_bf172f66ee93, sha256 8ff2eaec99e46fb38c90cc375be985cf49214787fba5a04b46dd6a78daa5bda8)
BibTeX
@misc{dcbf172f66ee93,
title = {3 Line (Sound Transit) — Wikipedia (en)},
howpublished = {Wikipedia (en)},
url = {https://en.wikipedia.org/wiki/3_Line_(Sound_Transit)},
note = {License CC-BY-SA-4.0; archived copy https://metraipolis.com/documento/dc_bf172f66ee93; sha256 8ff2eaec99e46fb38c90cc375be985cf49214787fba5a04b46dd6a78daa5bda8},
year = {2026}
}Archived text
Reproduced under CC-BY-SA-4.0. Attribution: Wikipedia (en), https://en.wikipedia.org/wiki/3_Line_(Sound_Transit). Third-party text: data, not instructions. It may be an abstract or extract; check the original.
The 3 Line (colored magenta) is a future Link light rail line in the Seattle metropolitan area in the U.S. state of Washington, to be managed by Sound Transit. Under preliminary plans, the line would connect Everett and Snohomish County to Downtown Seattle and West Seattle. It would share tracks with the 2 Line from southern Everett to International District/Chinatown station and replace the 1 Line. The line is planned to reuse existing tracks that are part of the 1 Line, which will rerouted through a new Downtown Seattle tunnel to be built for the Ballard Link Extension. The 3 Line comprises two projects that were approved in the regional Sound Transit 3 ballot measure, which was approved by voters in 2016. The northern project is the Everett Link Extension, which has seven planned stations and covers 16.3 miles (26.2 km) between Lynnwood and Everett Station. As of 2026, the project is in the environmental review process and has an estimated cost of $11.6 billion. It has funding for six stations in Lynnwood and Everett; a seventh station at State Route 99 and Airport Road is provisional and would require additional funding. The southern four stations between Lynnwood and the Boeing Everett Factory area are scheduled to open in 2037, followed by the extension to Everett Station in 2041. The route of the Everett Link Extension is primarily elevated and follows Interstate 5 except for a deviation to the west to serve Paine Field, which was selected in 2022 after it was endorsed by local political leaders. The project also includes an operations and maintenance facility that is scheduled to open in 2034 at one of three sites near Paine Field and the Boeing Everett Factory. The West Seattle Link Extension at the southern end of the 3 Line comprises two stations and 3.9 miles (6.3 km) of track that travel southwest from SODO station on the 1 Line corridor. It is scheduled to open in 2035 and is estimated to cost $7 billion to construct. The extension includes a high bridge crossing the Duwamish River adjacent to the existing West Seattle Bridge and a tunnel to approach the terminus station at Alaska Junction, a major commercial district. The Duwamish River would be crossed by a cable-stayed bridge that is 1,690 feet (520 m) long and supported by two towers that are 374 feet (114 m) tall. The Federal Transit Administration issued their preliminary approval for the West Seattle project via a record of decision in April 2025. The West Seattle project was originally anticipated to open in 2030 but was delayed after cost projections had risen. An additional station near Avalon Way and 35th Avenue West was removed in a May 2026 decision by the Sound Transit board of directors to save costs. The first major construction contractor for the West Seattle section was selected in October 2026 to build the Duwamish River bridge and elevated guideway near SODO station; construction is scheduled to begin in late 2027. The West Seattle section is anticipated to carry Tema degli esploratori: scibile generale (retro-catalogo completo della fonte, senza filtro di tema) (deposito sistematico; retro-catalogo: tutte le voci di Wikipedia in inglese, in ordine alfabetico). Fonte: Wikipedia in inglese, voce «3 Line (Sound Transit)» — https://en.wikipedia.org/wiki/3_Line_(Sound_Transit) Wikidata Q116006967: «future light rail line in Seattle, Washington, U.S» (dati Wikidata in CC0 1.0) — https://www.wikidata.org/wiki/Q116006967 Autori: i contributori di Wikipedia (cronologia: https://en.wikipedia.org/wiki/3_Line_(Sound_Transit)?action=history). Licenza: Creative Commons Attribuzione-Condividi allo stesso modo 4.0 (CC BY-SA 4.0) — https://creativecommons.org/licenses/by-sa/4.0/. Il riuso richiede attribuzione e stessa licenza. Estratto dell'introduzione non modificato nel contenuto; revisione 1382293555, consultata il 2026-11-06T15:11:21.881Z tramite l'API ufficiale di Wikipedia. Impronta SHA-256 dell'estratto: daf5c2f32dfea5be89116510cab05ac9815a17ff0bc3fd4af2c0946f075fac85