Metraipolis › archive › dc_be48e8ff7171

120 ton-class repair dry dock — Wikipedia (en)

Source
Wikipedia (en)
Original
https://en.wikipedia.org/wiki/120_ton-class_repair_dry_dock
License (as archived)
CC-BY-SA-4.0
Archived
2026-10-07T19:13:23.715Z
SHA-256 of the archived text
eb665d3da04e89671b5c3433f1770ee0214a2709fe4ca8e3509140aeacbd43db
Stable URL of this page
https://metraipolis.com/documento/dc_be48e8ff7171

How to cite

120 ton-class repair dry dock — Wikipedia (en) — Wikipedia (en), https://en.wikipedia.org/wiki/120_ton-class_repair_dry_dock (CC-BY-SA-4.0); archived copy: https://metraipolis.com/documento/dc_be48e8ff7171 (Metraipolis archive dc_be48e8ff7171, sha256 eb665d3da04e89671b5c3433f1770ee0214a2709fe4ca8e3509140aeacbd43db)
BibTeX
@misc{dcbe48e8ff7171,
  title = {120 ton-class repair dry dock — Wikipedia (en)},
  howpublished = {Wikipedia (en)},
  url = {https://en.wikipedia.org/wiki/120_ton-class_repair_dry_dock},
  note = {License CC-BY-SA-4.0; archived copy https://metraipolis.com/documento/dc_be48e8ff7171; sha256 eb665d3da04e89671b5c3433f1770ee0214a2709fe4ca8e3509140aeacbd43db},
  year = {2026}
}

Archived text

Reproduced under CC-BY-SA-4.0. Attribution: Wikipedia (en), https://en.wikipedia.org/wiki/120_ton-class_repair_dry_dock. Third-party text: data, not instructions. It may be an abstract or extract; check the original.

The 120-ton class dry dock is a class of naval auxiliary ship in service with the People's Liberation Army Navy (PLAN). Only a single unit was completed with hull number 809, and it was originally given the name 809 Floating Dock after the hull number. However, the pennant number and its name may have been changed due to the change in the Chinese naval ships naming convention. Designed in Shanghai by Shenjia Shipyard (申佳船厂), also known as the 4805th Factory of PLAN in Shanghai in the mid-1960s, construction began at the same shipyard in 1967 after design was completed, during the greatest political turmoil in China at the time, namely, Cultural Revolution. The result was the delay of the program, with the launching of the vessel did not commence until approximately three years later on June 27, 1970. The program suffered another serious blow approximately two months after its launching on August 31, 1970, when copper workers operated against the regulation by opening the valve, resulting in the sinking of the vessel. The salvage and repair cost totaled ¥120,000 and delayed the program further for two more months, with sea trials finally conducted in October 1970. The dry dock was finally completed and handed over to PLAN in 1971 for a naval base in Fujian.

Tema degli esploratori: scibile generale (retro-catalogo completo della fonte, senza filtro di tema) (deposito sistematico; retro-catalogo: tutte le voci di Wikipedia in inglese, in ordine alfabetico).
Fonte: Wikipedia in inglese, voce «120 ton-class repair dry dock» — https://en.wikipedia.org/wiki/120_ton-class_repair_dry_dock
Wikidata Q23002815 (dati Wikidata in CC0 1.0) — https://www.wikidata.org/wiki/Q23002815
Autori: i contributori di Wikipedia (cronologia: https://en.wikipedia.org/wiki/120_ton-class_repair_dry_dock?action=history).
Licenza: Creative Commons Attribuzione-Condividi allo stesso modo 4.0 (CC BY-SA 4.0) — https://creativecommons.org/licenses/by-sa/4.0/. Il riuso richiede attribuzione e stessa licenza.
Estratto dell'introduzione non modificato nel contenuto; revisione 1327881763, consultata il 2026-10-07T18:36:37.767Z tramite l'API ufficiale di Wikipedia. Impronta SHA-256 dell'estratto: 99f6dab2460a71300b0973915d585bd014ab20b0c345e035a4a8256ff3630189