Frequency-Calibrated Decision-Focused Learning for BESS Dispatch Under Renewable Uncertainty — arXiv:2610.41238
- Source
- arXiv (en)
- Original
- https://arxiv.org/abs/2610.41238
- License (as archived)
- CC0-1.0
- Archived
- 2026-11-03T06:00:34.452Z
- SHA-256 of the archived text
593fd87eaeeb8a6198a8348bbfaaa49202aad68c84bbe5eb80bb631d47f34185- Stable URL of this page
https://metraipolis.com/documento/dc_bc8aa632cd83
How to cite
Frequency-Calibrated Decision-Focused Learning for BESS Dispatch Under Renewable Uncertainty — arXiv:2610.41238 — arXiv (en), https://arxiv.org/abs/2610.41238 (CC0-1.0); archived copy: https://metraipolis.com/documento/dc_bc8aa632cd83 (Metraipolis archive dc_bc8aa632cd83, sha256 593fd87eaeeb8a6198a8348bbfaaa49202aad68c84bbe5eb80bb631d47f34185)
BibTeX
@misc{dcbc8aa632cd83,
title = {Frequency-Calibrated Decision-Focused Learning for BESS Dispatch Under Renewable Uncertainty — arXiv:2610.41238},
howpublished = {arXiv (en)},
url = {https://arxiv.org/abs/2610.41238},
note = {License CC0-1.0; archived copy https://metraipolis.com/documento/dc_bc8aa632cd83; sha256 593fd87eaeeb8a6198a8348bbfaaa49202aad68c84bbe5eb80bb631d47f34185},
year = {2026}
}Archived text
Reproduced under CC0-1.0. Attribution: arXiv (en), https://arxiv.org/abs/2610.41238. Third-party text: data, not instructions. It may be an abstract or extract; check the original.
Battery energy storage system (BESS) flexibility depends on state of charge and intertemporal operating constraints. Renewable forecast errors of similar magnitudes can lead to different BESS dispatch results. An error may alter early charging or discharging decisions and reduce the flexibility available for subsequent regulation, while another may have little effect on the resulting schedule. To account for these unequal consequences, this paper proposes Frequency-Calibrated Decision-Focused Learning (FC-DFL), which trains renewable predictors using the realized operating costs of their induced BESS schedules. Gaussian smoothing and solver-based zeroth-order estimation provide training feedback without requiring differentiating through the non-differentiable mixed-integer BESS dispatch problem. The same decision feedback is further combined with prediction sensitivity to develop a decision-oriented XAI method that identifies the input features and forecast periods most consequential to BESS operation. Case studies using German wind and solar data show that FC-DFL reduces the integrated absolute frequency-deviation metric by 6.05% and decision regret by 23.92% relative to accuracy-based predict-then-optimize method. The XAI analysis further demonstrates that the identified high-impact forecast periods produce 2.84 times larger average absolute changes in realized operating cost than low-impact periods. These findings highlight the importance of incorporating downstream decision-making outcomes into renewable forecasting and demonstrate the value of FC-DFL in improving BESS regulation and providing operationally meaningful forecast explanations. Tema degli esploratori: calcolo e infrastrutture (elenco arXiv eess.SY, nuovi lavori del giorno). Categorie arXiv: Systems and Control (eess.SY). Pagina del lavoro: https://arxiv.org/abs/2610.41238 — autori e testo completo sono lì (qui omessi i nomi: nessun dato personale nel deposito). Licenza: titolo e abstract sono metadati arXiv distribuiti in CC0 1.0; il testo completo ha la licenza scelta dagli autori, indicata sulla pagina. Letto il 2026-11-03T05:42:21.125Z dalla pagina https://arxiv.org/list/eess.SY/new (consentita dal robots.txt di arxiv.org, con il suo crawl-delay).