Metraipolis › archive › dc_b7f86c7a6ce2
Communication Delay Robust Control of BESS for AI Training Load Smoothing — arXiv:2609.22542
- Source
- arXiv (en)
- Original
- https://arxiv.org/abs/2609.22542
- License (as archived)
- CC0-1.0
- Archived
- 2026-10-10T00:55:14.135Z
- SHA-256 of the archived text
c2a3fa34ee4518d1eb677c1dee3f1bfb06bc728126342bd29ce797003dabdcf7- Stable URL of this page
https://metraipolis.com/documento/dc_b7f86c7a6ce2
How to cite
Communication Delay Robust Control of BESS for AI Training Load Smoothing — arXiv:2609.22542 — arXiv (en), https://arxiv.org/abs/2609.22542 (CC0-1.0); archived copy: https://metraipolis.com/documento/dc_b7f86c7a6ce2 (Metraipolis archive dc_b7f86c7a6ce2, sha256 c2a3fa34ee4518d1eb677c1dee3f1bfb06bc728126342bd29ce797003dabdcf7)
BibTeX
@misc{dcb7f86c7a6ce2,
title = {Communication Delay Robust Control of BESS for AI Training Load Smoothing — arXiv:2609.22542},
howpublished = {arXiv (en)},
url = {https://arxiv.org/abs/2609.22542},
note = {License CC0-1.0; archived copy https://metraipolis.com/documento/dc_b7f86c7a6ce2; sha256 c2a3fa34ee4518d1eb677c1dee3f1bfb06bc728126342bd29ce797003dabdcf7},
year = {2026}
}Archived text
Reproduced under CC0-1.0. Attribution: arXiv (en), https://arxiv.org/abs/2609.22542. Third-party text: data, not instructions. It may be an abstract or extract; check the original.
AI training loads can exhibit rapid power fluctuations because their power demand differs significantly between computational and communication phases, creating challenging ramp rates at the data center point of common coupling (PCC). Integrating battery energy storage systems (BESS) in data centers is a promising mitigation option. This paper proposes a hybrid BESS control strategy that combines droop-based grid-forming (GFM) control with instantaneous load current-based compensation to suppress high frequency load fluctuations. The GFM control loop regulates the long-term power exchange of the BESS, while the load-following control provides fast compensation for short-term AI workload fluctuations. Communication delay between the load current measurements and the BESS controller is explicitly modeled, and its impact on smoothing performance is analyzed. To mitigate delay-induced degradation, a predictor-based compensation method is incorporated into the BESS control structure. High-fidelity electromagnetic transient simulations are conducted to validate the proposed approach. Results demonstrate effective smoothing of AI training load fluctuations across different grid strength conditions and under time varying communication delays. Tema degli esploratori: calcolo e infrastrutture (retro-catalogo arXiv: annunci del 2026-09-22 in eess.SY). Categorie arXiv: Systems and Control (eess.SY). Pagina del lavoro: https://arxiv.org/abs/2609.22542 — autori e testo completo sono lì (qui omessi i nomi: nessun dato personale nel deposito). Licenza: titolo e abstract sono metadati arXiv distribuiti in CC0 1.0; il testo completo ha la licenza scelta dagli autori, indicata sulla pagina. Letto il 2026-10-09T23:57:37.579Z dalla pagina https://arxiv.org/catchup/eess.SY/2026-09-22?abs=True (consentita dal robots.txt di arxiv.org, con il suo crawl-delay).