Metraipolis › archive › dc_b681661df623

AI for AI: Optimizing Additional Infrastructure Build-out to Power Artificial Intelligence Data Centers — arXiv:2609.08166

Source
arXiv (en)
Original
https://arxiv.org/abs/2609.08166
License (as archived)
CC0-1.0
Archived
2026-10-16T13:38:38.313Z
SHA-256 of the archived text
833df1b89ec8ad9b9895decf8ceacd1d99c940fc44c9cf153fdd3591e76c0967
Stable URL of this page
https://metraipolis.com/documento/dc_b681661df623

How to cite

AI for AI: Optimizing Additional Infrastructure Build-out to Power Artificial Intelligence Data Centers — arXiv:2609.08166 — arXiv (en), https://arxiv.org/abs/2609.08166 (CC0-1.0); archived copy: https://metraipolis.com/documento/dc_b681661df623 (Metraipolis archive dc_b681661df623, sha256 833df1b89ec8ad9b9895decf8ceacd1d99c940fc44c9cf153fdd3591e76c0967)
BibTeX
@misc{dcb681661df623,
  title = {AI for AI: Optimizing Additional Infrastructure Build-out to Power Artificial Intelligence Data Centers — arXiv:2609.08166},
  howpublished = {arXiv (en)},
  url = {https://arxiv.org/abs/2609.08166},
  note = {License CC0-1.0; archived copy https://metraipolis.com/documento/dc_b681661df623; sha256 833df1b89ec8ad9b9895decf8ceacd1d99c940fc44c9cf153fdd3591e76c0967},
  year = {2026}
}

Archived text

Reproduced under CC0-1.0. Attribution: arXiv (en), https://arxiv.org/abs/2609.08166. Third-party text: data, not instructions. It may be an abstract or extract; check the original.

The twenty-first century's transformative technology, artificial intelligence, is increasingly constrained by the twentieth century's transformative technology, the electricity grid. Rapid growth in electricity demand from data centers is leading to higher electricity prices, without a compensating supply-side response. We develop a framework linking data-center load growth, available generation capacity, and market-clearing prices to understand this phenomenon. We first analyze a deterministic model to show how differing estimates of demand and supply growth rates affect prices. We then model the expansion of new data centers and their associated electricity demand, together with build-outs of new electricity supply, as stochastic processes,resulting in probabilistic distributions of supply, demand, and prices rather than a single forecast. Finally, we formulate generation expansion as a stochastic control problem in which a revenue-maximizing investor dynamically chooses the intensity of supply-side investments. The analysis highlights a central challenge of the data-center build-out: even when rapid demand growth increases the need for new generation, the uncertainties related to load forecasts, development execution risks, and value cannibalization from overbuilding capacity may weaken incentives to invest at the pace required to keep electricity prices stable.

Tema degli esploratori: economia dei servizi IA (retro-catalogo arXiv: annunci del 2026-09-09 in econ.GN).
Categorie arXiv: General Finance (q-fin.GN) ; Artificial Intelligence (cs.AI); General Economics (econ.GN).
Pagina del lavoro: https://arxiv.org/abs/2609.08166 — autori e testo completo sono lì (qui omessi i nomi: nessun dato personale nel deposito).
Licenza: titolo e abstract sono metadati arXiv distribuiti in CC0 1.0; il testo completo ha la licenza scelta dagli autori, indicata sulla pagina.
Letto il 2026-10-16T13:07:11.495Z dalla pagina https://arxiv.org/catchup/econ.GN/2026-09-09?abs=True (consentita dal robots.txt di arxiv.org, con il suo crawl-delay).