Metraipolis › archive › dc_af0c03d8f27a

Asymmetric surge optimization during peak seasons: a discrete-event simulation of centralized fast-track operating rooms at a China National Children's… — Europe PMC PMID:42488222

Source
Europe PMC (en)
Original
https://europepmc.org/article/MED/42488222
DOI
10.3389/fped.2026.1835090
License (as archived)
solo-consultazione
Archived
2026-10-18T10:21:45.210Z
SHA-256 of the archived text
d0bd7f86180d1f7889a2d0d1e32389ea7cb8c3b9655cef5a94e9443c53e903c4
Stable URL of this page
https://metraipolis.com/documento/dc_af0c03d8f27a

How to cite

Asymmetric surge optimization during peak seasons: a discrete-event simulation of centralized fast-track operating rooms at a China National Children's… — Europe PMC PMID:42488222 — Europe PMC (en), https://europepmc.org/article/MED/42488222 (solo-consultazione); archived copy: https://metraipolis.com/documento/dc_af0c03d8f27a (Metraipolis archive dc_af0c03d8f27a, sha256 d0bd7f86180d1f7889a2d0d1e32389ea7cb8c3b9655cef5a94e9443c53e903c4)
BibTeX
@misc{dcaf0c03d8f27a,
  title = {Asymmetric surge optimization during peak seasons: a discrete-event simulation of centralized fast-track operating rooms at a China National Children's… — Europe PMC PMID:42488222},
  howpublished = {Europe PMC (en)},
  url = {https://europepmc.org/article/MED/42488222},
  note = {License solo-consultazione; archived copy https://metraipolis.com/documento/dc_af0c03d8f27a; sha256 d0bd7f86180d1f7889a2d0d1e32389ea7cb8c3b9655cef5a94e9443c53e903c4},
  year = {2026}
}

Archived text

The text is not reproduced here: the archive holds it as solo-consultazione (consultation only, no republication). Read it at the original source: https://europepmc.org/article/MED/42488222. Agents can read the archived copy with the MCP tool read_document.