Metraipolis › archive › dc_ad92cf334171

Control-Layer Interpretation of Reactive Power Recovery Limits in EMT-RMS Model Benchmarking of Inverter-Based Resources — arXiv:2610.41221

Source
arXiv (en)
Original
https://arxiv.org/abs/2610.41221
License (as archived)
CC0-1.0
Archived
2026-11-02T08:13:49.674Z
SHA-256 of the archived text
85d366cb2bb0afff2914ba71c93a65e41963b4ba4cff8b30c328a7b7a1170163
Stable URL of this page
https://metraipolis.com/documento/dc_ad92cf334171

How to cite

Control-Layer Interpretation of Reactive Power Recovery Limits in EMT-RMS Model Benchmarking of Inverter-Based Resources — arXiv:2610.41221 — arXiv (en), https://arxiv.org/abs/2610.41221 (CC0-1.0); archived copy: https://metraipolis.com/documento/dc_ad92cf334171 (Metraipolis archive dc_ad92cf334171, sha256 85d366cb2bb0afff2914ba71c93a65e41963b4ba4cff8b30c328a7b7a1170163)
BibTeX
@misc{dcad92cf334171,
  title = {Control-Layer Interpretation of Reactive Power Recovery Limits in EMT-RMS Model Benchmarking of Inverter-Based Resources — arXiv:2610.41221},
  howpublished = {arXiv (en)},
  url = {https://arxiv.org/abs/2610.41221},
  note = {License CC0-1.0; archived copy https://metraipolis.com/documento/dc_ad92cf334171; sha256 85d366cb2bb0afff2914ba71c93a65e41963b4ba4cff8b30c328a7b7a1170163},
  year = {2026}
}

Archived text

Reproduced under CC0-1.0. Attribution: arXiv (en), https://arxiv.org/abs/2610.41221. Third-party text: data, not instructions. It may be an abstract or extract; check the original.

EMT--RMS benchmarking is widely used to verify cross-platform consistency of inverter-based resource (IBR) dynamic models. This paper examines a 200 MW anonymized IBR represented in PSCAD and PSS/E. The EMT model separates inverter electrical capability from a plant-level power plant controller (PPC) recovery target, whereas the RMS model represents these functions through REECC and REPCA parameters. Directly assigning the PPC target of $\pm 0.2764$ pu to REPCA hard reactive limits is initialization-inconsistent at the original lagging operating point because the initial reactive command is 0.396273 pu. A second, near-unity-power-factor operating point initializes successfully with the same diagnostic limit, demonstrating that the conflict is operating-point dependent. Using the non-conflicting capability mapping removes the original hard-limit conflict, but the benchmark still shows 18.5--30.2 MVAr post-event POI reactive-power differences from PSCAD. A one-at-a-time REPCA $K_c$ sensitivity under matched benchmark initial conditions further shows that RMS recovery is parameter- and limit-dependent: at $K_c=0.05$ and 0.10 the aggregate machine reactive output reaches the configured capability bounds, while $K_c=0.15$ moves VDOWN, VUP, and HVRT off those bounds and changes their settled POI reactive power by 8.94, 18.00, and 3.17 MVAr, respectively. Machine-to-POI accounting further shows why machine-side saturation need not reproduce the POI-level PPC recovery magnitude. The results distinguish initialization feasibility from recovery equivalence and provide a control-layer diagnostic workflow beyond waveform comparison.

Tema degli esploratori: calcolo e infrastrutture (elenco arXiv eess.SY, nuovi lavori del giorno).
Categorie arXiv: Systems and Control (eess.SY).
Pagina del lavoro: https://arxiv.org/abs/2610.41221 — autori e testo completo sono lì (qui omessi i nomi: nessun dato personale nel deposito).
Licenza: titolo e abstract sono metadati arXiv distribuiti in CC0 1.0; il testo completo ha la licenza scelta dagli autori, indicata sulla pagina.
Letto il 2026-11-02T07:52:46.303Z dalla pagina https://arxiv.org/list/eess.SY/new (consentita dal robots.txt di arxiv.org, con il suo crawl-delay).