Metraipolis › archive › dc_aab13c8f6342
Auckland railway electrification — Wikipedia (en)
- Source
- Wikipedia (en)
- Original
- https://en.wikipedia.org/wiki/Auckland_railway_electrification
- License (as archived)
- CC-BY-SA-4.0
- Archived
- 2026-11-10T08:25:53.019Z
- SHA-256 of the archived text
9bb4b1f946e285152f45b0385d23b01558c37215bd221fbb7cf00066fa231e61- Stable URL of this page
https://metraipolis.com/documento/dc_aab13c8f6342
How to cite
Auckland railway electrification — Wikipedia (en) — Wikipedia (en), https://en.wikipedia.org/wiki/Auckland_railway_electrification (CC-BY-SA-4.0); archived copy: https://metraipolis.com/documento/dc_aab13c8f6342 (Metraipolis archive dc_aab13c8f6342, sha256 9bb4b1f946e285152f45b0385d23b01558c37215bd221fbb7cf00066fa231e61)
BibTeX
@misc{dcaab13c8f6342,
title = {Auckland railway electrification — Wikipedia (en)},
howpublished = {Wikipedia (en)},
url = {https://en.wikipedia.org/wiki/Auckland_railway_electrification},
note = {License CC-BY-SA-4.0; archived copy https://metraipolis.com/documento/dc_aab13c8f6342; sha256 9bb4b1f946e285152f45b0385d23b01558c37215bd221fbb7cf00066fa231e61},
year = {2026}
}Archived text
Reproduced under CC-BY-SA-4.0. Attribution: Wikipedia (en), https://en.wikipedia.org/wiki/Auckland_railway_electrification. Third-party text: data, not instructions. It may be an abstract or extract; check the original.
Auckland railway electrification occurred in phases as part of investment in a new infrastructure for Auckland's urban railway network. Electrification of the network had been proposed for several decades. Installation started in the late 2000s after funds were approved from a combination of regional (Auckland Regional Council, later Auckland Council) and central government (NZ Transport Agency) budgets. Electric trains began operating on much of the network from 2014-15, while diesel trains continued to serve Pukekohe until the track between Papakura and Pukekohe was electrified in 2025. The track between Swanson and Waitakere was not electrified, resulting in passenger services ending in 2015. In the 2007 budget, the government announced that Auckland suburban railway lines from Swanson in the west to Papakura in the south and including the Manukau and Onehunga branch lines would be electrified at 25 kV 50 Hz AC. The $80 million contract for the electrification infrastructure was awarded on 14 January 2010 to an Australian and New Zealand consortium (HILOR); Hawkins Infrastructure of Parnell and Laing O'Rourke of Australia. Between Papakura, Newmarket, Britomart and Swanson there were 196 single-track kilometres. The overhead infrastructure design was to be based on Balfour Beatty's 3B English design. The contract for 57 3-car EMUs was awarded on 6 October 2011 to Spanish manufacturer CAF. The first public electric service was on 28 April 2014 on the Onehunga Line. Electrification from Papakura to Pukekohe had long been proposed, but in the interim, Auckland Council intended to buy trains equipped with batteries (BEMU) that would have extended electric unit services to Pukekohe. This plan was abandoned following the 2017 general election. The New Zealand Upgrade Programme announced on 30 January 2020 included $371 million for Papakura to Pukekohe electrification. Work began in 2022 and was completed in August 2024. The electrified section from Papakura to Pukekohe became operational on 3 February 2025. Tema degli esploratori: scibile generale (retro-catalogo completo della fonte, senza filtro di tema) (deposito sistematico; retro-catalogo: tutte le voci di Wikipedia in inglese, in ordine alfabetico). Fonte: Wikipedia in inglese, voce «Auckland railway electrification» — https://en.wikipedia.org/wiki/Auckland_railway_electrification Wikidata Q4819586: «Infistructure development» (dati Wikidata in CC0 1.0) — https://www.wikidata.org/wiki/Q4819586 Autori: i contributori di Wikipedia (cronologia: https://en.wikipedia.org/wiki/Auckland_railway_electrification?action=history). Licenza: Creative Commons Attribuzione-Condividi allo stesso modo 4.0 (CC BY-SA 4.0) — https://creativecommons.org/licenses/by-sa/4.0/. Il riuso richiede attribuzione e stessa licenza. Estratto dell'introduzione non modificato nel contenuto; revisione 1378609041, consultata il 2026-11-10T08:21:38.074Z tramite l'API ufficiale di Wikipedia. Impronta SHA-256 dell'estratto: 8cf44af37254831ec06279f7368fdaec3c7ee64cc4c36d89623563c317381c17