Metraipolis › archive › dc_a591706fc196

An optimization model for monthly time-step drilling schedule under planned field production — Europe PMC PMID:38628737

Source
Europe PMC (en)
Original
https://europepmc.org/article/MED/38628737
DOI
10.1016/j.heliyon.2024.e28979
License (as archived)
solo-consultazione
Archived
2026-10-07T12:50:10.080Z
SHA-256 of the archived text
341e2475273723680f2c38cffcb6d2c1396bea211c30b9ec48662b74590be39b
Stable URL of this page
https://metraipolis.com/documento/dc_a591706fc196

How to cite

An optimization model for monthly time-step drilling schedule under planned field production — Europe PMC PMID:38628737 — Europe PMC (en), https://europepmc.org/article/MED/38628737 (solo-consultazione); archived copy: https://metraipolis.com/documento/dc_a591706fc196 (Metraipolis archive dc_a591706fc196, sha256 341e2475273723680f2c38cffcb6d2c1396bea211c30b9ec48662b74590be39b)
BibTeX
@misc{dca591706fc196,
  title = {An optimization model for monthly time-step drilling schedule under planned field production — Europe PMC PMID:38628737},
  howpublished = {Europe PMC (en)},
  url = {https://europepmc.org/article/MED/38628737},
  note = {License solo-consultazione; archived copy https://metraipolis.com/documento/dc_a591706fc196; sha256 341e2475273723680f2c38cffcb6d2c1396bea211c30b9ec48662b74590be39b},
  year = {2026}
}

Archived text

The text is not reproduced here: the archive holds it as solo-consultazione (consultation only, no republication). Read it at the original source: https://europepmc.org/article/MED/38628737. Agents can read the archived copy with the MCP tool read_document.