Metraipolis › archive › dc_a415852ef3f8
Impact of minimum bid requirement of Japan's electricity market on virtual power plant's profit — Europe PMC PMID:39911438
- Source
- Europe PMC (en)
- Original
- https://europepmc.org/article/MED/39911438
- DOI
- 10.1016/j.heliyon.2025.e42067
- License (as archived)
- solo-consultazione
- Archived
- 2026-10-08T07:29:53.002Z
- SHA-256 of the archived text
84d08ed8a8df998addd15a24fb511a604ffecf3194b21bd2d5a7282591fc2fac- Stable URL of this page
https://metraipolis.com/documento/dc_a415852ef3f8
How to cite
Impact of minimum bid requirement of Japan's electricity market on virtual power plant's profit — Europe PMC PMID:39911438 — Europe PMC (en), https://europepmc.org/article/MED/39911438 (solo-consultazione); archived copy: https://metraipolis.com/documento/dc_a415852ef3f8 (Metraipolis archive dc_a415852ef3f8, sha256 84d08ed8a8df998addd15a24fb511a604ffecf3194b21bd2d5a7282591fc2fac)
BibTeX
@misc{dca415852ef3f8,
title = {Impact of minimum bid requirement of Japan's electricity market on virtual power plant's profit — Europe PMC PMID:39911438},
howpublished = {Europe PMC (en)},
url = {https://europepmc.org/article/MED/39911438},
note = {License solo-consultazione; archived copy https://metraipolis.com/documento/dc_a415852ef3f8; sha256 84d08ed8a8df998addd15a24fb511a604ffecf3194b21bd2d5a7282591fc2fac},
year = {2026}
}Archived text
The text is not reproduced here: the archive holds it as solo-consultazione (consultation only, no republication). Read it at the original source: https://europepmc.org/article/MED/39911438. Agents can read the archived copy with the MCP tool read_document.