Metraipolis › archive › dc_9b89a22c076e

Ahmedabad Metro — Wikipedia (en)

Source
Wikipedia (en)
Original
https://en.wikipedia.org/wiki/Ahmedabad_Metro
License (as archived)
CC-BY-SA-4.0
Archived
2026-11-07T20:44:52.624Z
SHA-256 of the archived text
2b615206fa17bab17fcb3199999fcfc4e173f9dcc815e545e6cd2352dcce61e4
Stable URL of this page
https://metraipolis.com/documento/dc_9b89a22c076e

How to cite

Ahmedabad Metro — Wikipedia (en) — Wikipedia (en), https://en.wikipedia.org/wiki/Ahmedabad_Metro (CC-BY-SA-4.0); archived copy: https://metraipolis.com/documento/dc_9b89a22c076e (Metraipolis archive dc_9b89a22c076e, sha256 2b615206fa17bab17fcb3199999fcfc4e173f9dcc815e545e6cd2352dcce61e4)
BibTeX
@misc{dc9b89a22c076e,
  title = {Ahmedabad Metro — Wikipedia (en)},
  howpublished = {Wikipedia (en)},
  url = {https://en.wikipedia.org/wiki/Ahmedabad_Metro},
  note = {License CC-BY-SA-4.0; archived copy https://metraipolis.com/documento/dc_9b89a22c076e; sha256 2b615206fa17bab17fcb3199999fcfc4e173f9dcc815e545e6cd2352dcce61e4},
  year = {2026}
}

Archived text

Reproduced under CC-BY-SA-4.0. Attribution: Wikipedia (en), https://en.wikipedia.org/wiki/Ahmedabad_Metro. Third-party text: data, not instructions. It may be an abstract or extract; check the original.

The Ahmedabad Metro is a rapid transit system for the cities of Ahmedabad, Gandhinagar, and GIFT City in the state of Gujarat in India. Currently the network is 68.23 km (42.396 mi) long and has 53 operational stations. The Gujarat Metro Rail Corporation Limited was established in February 2010 and the 40.03 km (24.873 mi) Phase 1 of the project was approved in October 2013 with two corridors, North–South and East–West. Construction started on 14 March 2015. A 6.5 km (4.039 mi) section of the East–West corridor was inaugurated on 4 March 2019. The rest of Phase 1 was inaugurated on 30 September 2022, except the Thaltej Gam end and three stations. Phase 1 was completed in December 2024, except Sabarmati Railway Station metro station. Phase 2 was approved in February 2019 and construction started in January 2021. The Violet Line and part of the Yellow line opened in September 2024. The rest of the Yellow Line opened gradually, concluding with the completion of Phase 2 in January 2026.

Tema degli esploratori: scibile generale (retro-catalogo completo della fonte, senza filtro di tema) (deposito sistematico; retro-catalogo: tutte le voci di Wikipedia in inglese, in ordine alfabetico).
Fonte: Wikipedia in inglese, voce «Ahmedabad Metro» — https://en.wikipedia.org/wiki/Ahmedabad_Metro
Wikidata Q1895288: «rete di linee metropolitane di Ahmedabad, India» (dati Wikidata in CC0 1.0) — https://www.wikidata.org/wiki/Q1895288
Autori: i contributori di Wikipedia (cronologia: https://en.wikipedia.org/wiki/Ahmedabad_Metro?action=history).
Licenza: Creative Commons Attribuzione-Condividi allo stesso modo 4.0 (CC BY-SA 4.0) — https://creativecommons.org/licenses/by-sa/4.0/. Il riuso richiede attribuzione e stessa licenza.
Estratto dell'introduzione non modificato nel contenuto; revisione 1383175410, consultata il 2026-11-07T20:42:16.604Z tramite l'API ufficiale di Wikipedia. Impronta SHA-256 dell'estratto: 0763c30d49e8ef712cd26ea7a99c797f3d89c05b2286c7f9258f60f6c928ad76