Multi-Timescale Deliverability of Shared Hybrid Storage for AI Data Center Campuses — arXiv:2610.41249

Source
arXiv (en)
Original
https://arxiv.org/abs/2610.41249
License (as archived)
CC0-1.0
Archived
2026-11-02T05:15:32.595Z
SHA-256 of the archived text
bc897f2de0961768c6010f5220d487bea8431b4916a677eddac85c2904a622cc
Stable URL of this page
https://metraipolis.com/documento/dc_92d3a89902b3

How to cite

Multi-Timescale Deliverability of Shared Hybrid Storage for AI Data Center Campuses — arXiv:2610.41249 — arXiv (en), https://arxiv.org/abs/2610.41249 (CC0-1.0); archived copy: https://metraipolis.com/documento/dc_92d3a89902b3 (Metraipolis archive dc_92d3a89902b3, sha256 bc897f2de0961768c6010f5220d487bea8431b4916a677eddac85c2904a622cc)
BibTeX
@misc{dc92d3a89902b3,
  title = {Multi-Timescale Deliverability of Shared Hybrid Storage for AI Data Center Campuses — arXiv:2610.41249},
  howpublished = {arXiv (en)},
  url = {https://arxiv.org/abs/2610.41249},
  note = {License CC0-1.0; archived copy https://metraipolis.com/documento/dc_92d3a89902b3; sha256 bc897f2de0961768c6010f5220d487bea8431b4916a677eddac85c2904a622cc},
  year = {2026}
}

Archived text

Reproduced under CC0-1.0. Attribution: arXiv (en), https://arxiv.org/abs/2610.41249. Third-party text: data, not instructions. It may be an abstract or extract; check the original.

Artificial intelligence data center (AIDC) campuses contain sustained power variations and subsecond power fluctuations, requiring both sufficient stored energy and fast response. A shared hybrid energy storage system (HESS) can mitigate aggregate AIDC power deviations, but interval-based schedules cannot capture the delay between commanded and delivered power at the campus point of common coupling (PCC). To this end, this paper proposes a multi-timescale scheduling model for mitigating AIDC power fluctuations with the shared HESS. First, it models electrical pooling at the campus bus and constrains the shared HESS to a single PCC injection. Second, a two-layer model passes five-minute scheduled power, energy state, and reserve capacity to a causal fast response model that distinguishes commanded power from delivered power. Case studies using the National Laboratory of the Rockies (NLR) GenAI Power Profiles Dataset show reductions in both PCC and fast integral absolute error (IAE), while retaining most of the improvement available under ideal response.

Tema degli esploratori: calcolo e infrastrutture (elenco arXiv eess.SY, nuovi lavori del giorno).
Categorie arXiv: Systems and Control (eess.SY).
Pagina del lavoro: https://arxiv.org/abs/2610.41249 — autori e testo completo sono lì (qui omessi i nomi: nessun dato personale nel deposito).
Licenza: titolo e abstract sono metadati arXiv distribuiti in CC0 1.0; il testo completo ha la licenza scelta dagli autori, indicata sulla pagina.
Letto il 2026-11-02T04:57:58.338Z dalla pagina https://arxiv.org/list/eess.SY/new (consentita dal robots.txt di arxiv.org, con il suo crawl-delay).