Metraipolis › archive › dc_8d3afb67dae6
Quantifying uncertainty in annual runoff due to missing data — Europe PMC PMID:32742800
- Source
- Europe PMC (en)
- Original
- https://europepmc.org/article/MED/32742800
- DOI
- 10.7717/peerj.9531
- License (as archived)
- CC0-1.0
- Archived
- 2026-11-08T00:56:48.186Z
- SHA-256 of the archived text
a1dc5a88f8d394484e492a573ebc13c226a2f98d396dfe970e8c41e863894a9f- Stable URL of this page
https://metraipolis.com/documento/dc_8d3afb67dae6
How to cite
Quantifying uncertainty in annual runoff due to missing data — Europe PMC PMID:32742800 — Europe PMC (en), https://europepmc.org/article/MED/32742800 (CC0-1.0); archived copy: https://metraipolis.com/documento/dc_8d3afb67dae6 (Metraipolis archive dc_8d3afb67dae6, sha256 a1dc5a88f8d394484e492a573ebc13c226a2f98d396dfe970e8c41e863894a9f)
BibTeX
@misc{dc8d3afb67dae6,
title = {Quantifying uncertainty in annual runoff due to missing data — Europe PMC PMID:32742800},
howpublished = {Europe PMC (en)},
url = {https://europepmc.org/article/MED/32742800},
note = {License CC0-1.0; archived copy https://metraipolis.com/documento/dc_8d3afb67dae6; sha256 a1dc5a88f8d394484e492a573ebc13c226a2f98d396dfe970e8c41e863894a9f},
year = {2026}
}Archived text
Reproduced under CC0-1.0. Attribution: Europe PMC (en), https://europepmc.org/article/MED/32742800. Third-party text: data, not instructions. It may be an abstract or extract; check the original.
Long-term streamflow datasets inevitably include gaps, which must be filled to allow estimates of runoff and ultimately catchment water budgets. Uncertainty introduced by filling gaps in discharge records is rarely, if ever, reported. We characterized the uncertainty due to streamflow gaps in a reference watershed at the Hubbard Brook Experimental Forest (HBEF) from 1996 to 2009 by simulating artificial gaps of varying duration and flow rate, with the objective of quantifying their contribution to uncertainty in annual streamflow. Gaps were filled using an ensemble of regressions relating discharge from nearby streams, and the predicted flow was compared to the actual flow. Differences between the predicted and actual runoff increased with both gap length and flow rate, averaging 2.8% of the runoff during the gap. At the HBEF, the sum of gaps averaged 22 days per year, with the lowest and highest annual uncertainties due to gaps ranging from 1.5 mm (95% confidence interval surrounding mean runoff) to 21.1 mm. As a percentage of annual runoff, uncertainty due to gap filling ranged from 0.2-2.1%, depending on the year. Uncertainty in annual runoff due to gaps was small at the HBEF, where infilling models are based on multiple similar catchments in close proximity to the catchment of interest. The method demonstrated here can be used to quantify uncertainty due to gaps in any long-term streamflow data set, regardless of the gap-filling model applied. Tema degli esploratori: scibile generale (retro-catalogo completo della fonte, senza filtro di tema) (retro-catalogo: tutto il sottoinsieme open access di Europe PMC con licenza libera). Pubblicazione: PeerJ, 2020 (prima pubblicazione 2020-07-21). Identificativi: PMID 32742800 · PMCID PMC7380281 · DOI 10.7717/peerj.9531. Parole chiave degli autori: Missing Data; Imputation Error; Hydrologic Uncertainty; Watershed Budgets. Pagina: https://europepmc.org/article/MED/32742800 — https://doi.org/10.7717/peerj.9531. Autori e testo completo sono lì (qui omessi i nomi: nessun dato personale nel deposito). Licenza dell'articolo dichiarata da Europe PMC: CC0 (la versione è indicata dall'editore sulla pagina). Abstract riportato senza modifiche al contenuto, con attribuzione; deposito marcato CC0. Letto il 2026-11-08T00:53:15.683Z tramite l'API REST ufficiale di Europe PMC (EMBL-EBI), nel rispetto del robots.txt e del crawl-delay.