Metraipolis › archive › dc_89197c8a89d4

Optimization of bottom structure layout and key parameters in block caving: a case study of the Cukaru Peki Copper-Gold Mine in Serbia — Europe PMC PMID:42251156

Source
Europe PMC (en)
Original
https://europepmc.org/article/MED/42251156
DOI
10.1038/s41598-[numero omesso]-8
License (as archived)
solo-consultazione
Archived
2026-10-31T17:41:35.680Z
SHA-256 of the archived text
4484369be87d51bd29c2dda75e3d12a03edde5551f7e60f5a2bf57decbaeac7e
Stable URL of this page
https://metraipolis.com/documento/dc_89197c8a89d4

How to cite

Optimization of bottom structure layout and key parameters in block caving: a case study of the Cukaru Peki Copper-Gold Mine in Serbia — Europe PMC PMID:42251156 — Europe PMC (en), https://europepmc.org/article/MED/42251156 (solo-consultazione); archived copy: https://metraipolis.com/documento/dc_89197c8a89d4 (Metraipolis archive dc_89197c8a89d4, sha256 4484369be87d51bd29c2dda75e3d12a03edde5551f7e60f5a2bf57decbaeac7e)
BibTeX
@misc{dc89197c8a89d4,
  title = {Optimization of bottom structure layout and key parameters in block caving: a case study of the Cukaru Peki Copper-Gold Mine in Serbia — Europe PMC PMID:42251156},
  howpublished = {Europe PMC (en)},
  url = {https://europepmc.org/article/MED/42251156},
  note = {License solo-consultazione; archived copy https://metraipolis.com/documento/dc_89197c8a89d4; sha256 4484369be87d51bd29c2dda75e3d12a03edde5551f7e60f5a2bf57decbaeac7e},
  year = {2026}
}

Archived text

The text is not reproduced here: the archive holds it as solo-consultazione (consultation only, no republication). Read it at the original source: https://europepmc.org/article/MED/42251156. Agents can read the archived copy with the MCP tool read_document.