EnergyNet in Practice: Long Grid, Short Grids and Mobility-Based Energy Peering — arXiv:2610.10958

Source
arXiv (en)
Original
https://arxiv.org/abs/2610.10958
License (as archived)
CC0-1.0
Archived
2026-10-09T07:13:34.738Z
SHA-256 of the archived text
55d14693cf931d1fe10ddc5b67aecd336a3b55d3e0d96b5263a2abb319237190
Stable URL of this page
https://metraipolis.com/documento/dc_8456f02ede94

How to cite

EnergyNet in Practice: Long Grid, Short Grids and Mobility-Based Energy Peering — arXiv:2610.10958 — arXiv (en), https://arxiv.org/abs/2610.10958 (CC0-1.0); archived copy: https://metraipolis.com/documento/dc_8456f02ede94 (Metraipolis archive dc_8456f02ede94, sha256 55d14693cf931d1fe10ddc5b67aecd336a3b55d3e0d96b5263a2abb319237190)
BibTeX
@misc{dc8456f02ede94,
  title = {EnergyNet in Practice: Long Grid, Short Grids and Mobility-Based Energy Peering — arXiv:2610.10958},
  howpublished = {arXiv (en)},
  url = {https://arxiv.org/abs/2610.10958},
  note = {License CC0-1.0; archived copy https://metraipolis.com/documento/dc_8456f02ede94; sha256 55d14693cf931d1fe10ddc5b67aecd336a3b55d3e0d96b5263a2abb319237190},
  year = {2026}
}

Archived text

Reproduced under CC0-1.0. Attribution: arXiv (en), https://arxiv.org/abs/2610.10958. Third-party text: data, not instructions. It may be an abstract or extract; check the original.

Electrification is planned as a network problem: more demand, more upstream capacity, local resources waiting for reinforcement. We argue that a material part of that bill, in money and time, follows from architecture, not electrification itself, and propose the Short Grid as the deployment unit: a locally controlled building, block or campus whose demand, generation, storage and local market operate behind Energy Routers enforcing an approved connection envelope to the Long Grid. Because the envelope governs exchange, not installed capacity, local resources can grow and many sites can build in parallel at the pace of PV and EV installation, not grid reinforcement. PV and EV batteries dominate today, but the architecture is general: any generation or storage, fixed or mobile, fits behind the same boundary and interfaces. EnergyNet Operators coordinate exchange among Short Grids and with the Long Grid; protection stays local; Vehicle-to-EnergyNet (V2EN) and Mobility-Based Energy Peering (MEP) make mobility-financed batteries accessible within and between them; priority-based operation protects critical services in shortage. We test it in models, not yet the field: a ten-building neighbourhood in Lund, Sweden; a bus-linked microgrid pair at Stanford and Half Moon Bay; and a proposed 20-site network in Rockaway, New York. Households and services are the largest demand category in Sweden, Denmark, Norway, California and New York (484 TWh/yr); halving their grid imports would be about 242 TWh. Europe's network investment to 2040 is estimated above EUR 1.2 trillion; modelling shows it depends on system design. Negagrid value, following the negawatt, counts network investment avoided, downsized or deferred, net of local substitute costs. "Don't pay twice": build coordinated local capability first; reinforce the Long Grid for what remains.

Tema degli esploratori: calcolo e infrastrutture (elenco arXiv eess.SY, nuovi lavori del giorno).
Categorie arXiv: Systems and Control (eess.SY).
Pagina del lavoro: https://arxiv.org/abs/2610.10958 — autori e testo completo sono lì (qui omessi i nomi: nessun dato personale nel deposito).