Metraipolis › archive › dc_7fe7766185c7
Adelanto Converter Station — Wikipedia (en)
- Source
- Wikipedia (en)
- Original
- https://en.wikipedia.org/wiki/Adelanto_Converter_Station
- License (as archived)
- CC-BY-SA-4.0
- Archived
- 2026-11-07T13:58:51.533Z
- SHA-256 of the archived text
ad020b3e731425a13a38adfebc78e25f9c0ac2886ed035d7e838ddd10f5720da- Stable URL of this page
https://metraipolis.com/documento/dc_7fe7766185c7
How to cite
Adelanto Converter Station — Wikipedia (en) — Wikipedia (en), https://en.wikipedia.org/wiki/Adelanto_Converter_Station (CC-BY-SA-4.0); archived copy: https://metraipolis.com/documento/dc_7fe7766185c7 (Metraipolis archive dc_7fe7766185c7, sha256 ad020b3e731425a13a38adfebc78e25f9c0ac2886ed035d7e838ddd10f5720da)
BibTeX
@misc{dc7fe7766185c7,
title = {Adelanto Converter Station — Wikipedia (en)},
howpublished = {Wikipedia (en)},
url = {https://en.wikipedia.org/wiki/Adelanto_Converter_Station},
note = {License CC-BY-SA-4.0; archived copy https://metraipolis.com/documento/dc_7fe7766185c7; sha256 ad020b3e731425a13a38adfebc78e25f9c0ac2886ed035d7e838ddd10f5720da},
year = {2026}
}Archived text
Reproduced under CC-BY-SA-4.0. Attribution: Wikipedia (en), https://en.wikipedia.org/wiki/Adelanto_Converter_Station. Third-party text: data, not instructions. It may be an abstract or extract; check the original.
Adelanto Converter Station in Adelanto, California, is the southern terminus of the 2,400 MW Path 27 Utah–California high voltage DC power (HVDC) transmission line. The station contains redundant thyristor-based HVDC converters rated for 1,200 MW continuous or 1,600 MW short term overload. The 300-acre (120 ha) station was completed in July, 1986 at a cost of US$131 million. The northern terminus of Path 27 is fossil fueled Intermountain Power Plant in Utah. An adjacent $45 million AC switching station owned by Los Angeles Department of Water and Power links to the Southern California grid via five 500-kV AC lines. ABB, who had built the station in 1986, upgraded its original 1,600 MW capacity to 2,400 MW in 2011. In 2012, an 11.4 MW solar array (less than 1% of the Utah plant's capacity) was installed at the facility at a cost of $48 million obtained with loans subsidized by the American Recovery and Reinvestment Act of 2009. Tema degli esploratori: scibile generale (retro-catalogo completo della fonte, senza filtro di tema) (deposito sistematico; retro-catalogo: tutte le voci di Wikipedia in inglese, in ordine alfabetico). Fonte: Wikipedia in inglese, voce «Adelanto Converter Station» — https://en.wikipedia.org/wiki/Adelanto_Converter_Station Wikidata Q23016607: «Converter station in California, United States» (dati Wikidata in CC0 1.0) — https://www.wikidata.org/wiki/Q23016607 Autori: i contributori di Wikipedia (cronologia: https://en.wikipedia.org/wiki/Adelanto_Converter_Station?action=history). Licenza: Creative Commons Attribuzione-Condividi allo stesso modo 4.0 (CC BY-SA 4.0) — https://creativecommons.org/licenses/by-sa/4.0/. Il riuso richiede attribuzione e stessa licenza. Estratto dell'introduzione non modificato nel contenuto; revisione 1383689226, consultata il 2026-11-07T13:54:32.899Z tramite l'API ufficiale di Wikipedia. Impronta SHA-256 dell'estratto: 4325b047c3d00e74b987bad8b9ac977c0ba0e36d98d9bc7219291d4fa14d42f8