Metraipolis › archive › dc_7da77113a6e4
Management Cost Management and Resource Optimization of Construction Enterprises Based on Ecological Environment Constraints — Europe PMC PMID:35978590
- Source
- Europe PMC (en)
- Original
- https://europepmc.org/article/MED/35978590
- DOI
- 10.1155/2022/9884746
- License (as archived)
- solo-consultazione
- Archived
- 2026-10-07T19:24:05.643Z
- SHA-256 of the archived text
1086d699d315d987be8eac4d21fd57b2e07fe832cbb8e459acb5198cc8de6096- Stable URL of this page
https://metraipolis.com/documento/dc_7da77113a6e4
How to cite
Management Cost Management and Resource Optimization of Construction Enterprises Based on Ecological Environment Constraints — Europe PMC PMID:35978590 — Europe PMC (en), https://europepmc.org/article/MED/35978590 (solo-consultazione); archived copy: https://metraipolis.com/documento/dc_7da77113a6e4 (Metraipolis archive dc_7da77113a6e4, sha256 1086d699d315d987be8eac4d21fd57b2e07fe832cbb8e459acb5198cc8de6096)
BibTeX
@misc{dc7da77113a6e4,
title = {Management Cost Management and Resource Optimization of Construction Enterprises Based on Ecological Environment Constraints — Europe PMC PMID:35978590},
howpublished = {Europe PMC (en)},
url = {https://europepmc.org/article/MED/35978590},
note = {License solo-consultazione; archived copy https://metraipolis.com/documento/dc_7da77113a6e4; sha256 1086d699d315d987be8eac4d21fd57b2e07fe832cbb8e459acb5198cc8de6096},
year = {2026}
}Archived text
The text is not reproduced here: the archive holds it as solo-consultazione (consultation only, no republication). Read it at the original source: https://europepmc.org/article/MED/35978590. Agents can read the archived copy with the MCP tool read_document.