Metraipolis › archive › dc_7bde5c10b3dd
Battery-Swapping Station Operation Under Forecast Uncertainty: A Scenario-Based Stochastic MPC Framework — arXiv:2608.16820
- Source
- arXiv (en)
- Original
- https://arxiv.org/abs/2608.16820
- License (as archived)
- CC0-1.0
- Archived
- 2026-10-18T20:19:14.526Z
- SHA-256 of the archived text
2c76385567e811ea329f2f771a88aeaae44d16a3dc10e0a51ad68e154e99a1e2- Stable URL of this page
https://metraipolis.com/documento/dc_7bde5c10b3dd
How to cite
Battery-Swapping Station Operation Under Forecast Uncertainty: A Scenario-Based Stochastic MPC Framework — arXiv:2608.16820 — arXiv (en), https://arxiv.org/abs/2608.16820 (CC0-1.0); archived copy: https://metraipolis.com/documento/dc_7bde5c10b3dd (Metraipolis archive dc_7bde5c10b3dd, sha256 2c76385567e811ea329f2f771a88aeaae44d16a3dc10e0a51ad68e154e99a1e2)
BibTeX
@misc{dc7bde5c10b3dd,
title = {Battery-Swapping Station Operation Under Forecast Uncertainty: A Scenario-Based Stochastic MPC Framework — arXiv:2608.16820},
howpublished = {arXiv (en)},
url = {https://arxiv.org/abs/2608.16820},
note = {License CC0-1.0; archived copy https://metraipolis.com/documento/dc_7bde5c10b3dd; sha256 2c76385567e811ea329f2f771a88aeaae44d16a3dc10e0a51ad68e154e99a1e2},
year = {2026}
}Archived text
Reproduced under CC0-1.0. Attribution: arXiv (en), https://arxiv.org/abs/2608.16820. Third-party text: data, not instructions. It may be an abstract or extract; check the original.
Battery-swapping stations (BSSs) can shorten electric-vehicle energy replenishment while using centrally managed battery inventories as flexible grid-connected storage. Realizing both benefits requires the station to schedule charging, grid discharge, and swapping service before future customer demand and electricity prices are known. This paper develops a forecast-aware rolling-horizon operating framework for this problem. A lightweight DLinear model predicts 24-hour price and demand trajectories, Stein variational gradient descent quantifies their uncertainty through representative scenarios, and a two-stage stochastic model predictive controller converts those scenarios into station decisions. The controller accounts for service shortfall, terminal readiness, a protected service buffer, and electrochemical degradation without assuming perfect future information. The application contribution is an implementable controller that coordinates the station's mobility-service and energy-storage roles. The methodological contribution is a modular forecast-to-control interface that separates the operational value of mean-forecast accuracy from that of uncertainty representation. In a 120-day closed-loop evaluation, DLinear-SVGD SMPC achieves the lowest cost among the implementable controllers. Relative to deterministic DLinear MPC, it reduces final cost by 1.2\% and service-shortfall hours by 80.7\%, with 99.10\% of the evaluated hours free of shortfall. Tema degli esploratori: matematica e informatica teorica (retro-catalogo arXiv: annunci del 2026-08-18 in math.OC). Categorie arXiv: Optimization and Control (math.OC). Pagina del lavoro: https://arxiv.org/abs/2608.16820 — autori e testo completo sono lì (qui omessi i nomi: nessun dato personale nel deposito). Licenza: titolo e abstract sono metadati arXiv distribuiti in CC0 1.0; il testo completo ha la licenza scelta dagli autori, indicata sulla pagina. Letto il 2026-10-18T19:45:07.857Z dalla pagina https://arxiv.org/catchup/math.OC/2026-08-18?abs=True (consentita dal robots.txt di arxiv.org, con il suo crawl-delay).