Metraipolis › archive › dc_77d031331542
2024 East–West Line disruption — Wikipedia (en)
- Source
- Wikipedia (en)
- Original
- https://en.wikipedia.org/wiki/2024_East%E2%80%93West_Line_disruption
- License (as archived)
- CC-BY-SA-4.0
- Archived
- 2026-11-05T22:05:01.242Z
- SHA-256 of the archived text
8dc256c519881ce0ace17292b35c1a3babee1bbd41d466f6047e8b8223355b5e- Stable URL of this page
https://metraipolis.com/documento/dc_77d031331542
How to cite
2024 East–West Line disruption — Wikipedia (en) — Wikipedia (en), https://en.wikipedia.org/wiki/2024_East%E2%80%93West_Line_disruption (CC-BY-SA-4.0); archived copy: https://metraipolis.com/documento/dc_77d031331542 (Metraipolis archive dc_77d031331542, sha256 8dc256c519881ce0ace17292b35c1a3babee1bbd41d466f6047e8b8223355b5e)
BibTeX
@misc{dc77d031331542,
title = {2024 East–West Line disruption — Wikipedia (en)},
howpublished = {Wikipedia (en)},
url = {https://en.wikipedia.org/wiki/2024_East%E2%80%93West_Line_disruption},
note = {License CC-BY-SA-4.0; archived copy https://metraipolis.com/documento/dc_77d031331542; sha256 8dc256c519881ce0ace17292b35c1a3babee1bbd41d466f6047e8b8223355b5e},
year = {2026}
}Archived text
Reproduced under CC-BY-SA-4.0. Attribution: Wikipedia (en), https://en.wikipedia.org/wiki/2024_East%E2%80%93West_Line_disruption. Third-party text: data, not instructions. It may be an abstract or extract; check the original.
On 25 September 2024, train services on the East–West Line (EWL) of the Singapore Mass Rapid Transit (MRT) system were disrupted when an axle box on a Kawasaki C151 train dislodged, derailing the train and damaging the track and equipment between Clementi and Dover stations. This resulted in the suspension of regular services between Boon Lay and Queenstown stations, affecting more than 2 million commuters. The damage was extensive, and services were not restored for several days. During restoration works by engineers from the Land Transport Authority (LTA) and SMRT Corporation, shuttle train services were restored between Queenstown and Buona Vista stations, and between Jurong East and Boon Lay stations. Bus-bridging services were provided for the closed segment between Buona Vista and Jurong East stations. Full services on the EWL resumed on 1 October. This was the worst breakdown in the MRT network's history. Investigations began on 2 October, and the LTA and the Transport Safety Investigation Bureau (TSIB) released separate findings on 3 June 2025. The LTA report concluded the failure began with degraded grease in an axle bearing, which caused overheating and fire damage to the chevron springs. This led to the detachment of the axle box and the train's derailment near Dover station. The TSIB report added that repairing a "Null ID" error in the software for SMRT's Hot Axle Box Detection System could have identified the affected train and prevented the incident. SMRT was subsequently fined S$2.4 million (US$1.8 million) and the Kawasaki C151 trains were withdrawn from revenue service by September 2025. Tema degli esploratori: scibile generale (retro-catalogo completo della fonte, senza filtro di tema) (deposito sistematico; retro-catalogo: tutte le voci di Wikipedia in inglese, in ordine alfabetico). Fonte: Wikipedia in inglese, voce «2024 East–West Line disruption» — https://en.wikipedia.org/wiki/2024_East%E2%80%93West_Line_disruption Wikidata Q130372524: «disruption» (dati Wikidata in CC0 1.0) — https://www.wikidata.org/wiki/Q130372524 Autori: i contributori di Wikipedia (cronologia: https://en.wikipedia.org/wiki/2024_East%E2%80%93West_Line_disruption?action=history). Licenza: Creative Commons Attribuzione-Condividi allo stesso modo 4.0 (CC BY-SA 4.0) — https://creativecommons.org/licenses/by-sa/4.0/. Il riuso richiede attribuzione e stessa licenza. Estratto dell'introduzione non modificato nel contenuto; revisione 1377659279, consultata il 2026-11-05T22:01:27.478Z tramite l'API ufficiale di Wikipedia. Impronta SHA-256 dell'estratto: 5fdc284863c70140dbbcf66c24c90422d697cd6ddf2d3574deb416f265cd016a