Metraipolis › archive › dc_71a1cc15b73f

Validated Data Onboarding for AI Demand Forecasting on U.S. Building Meter Data: Design, Controlled Evaluation, and a Corrected Negative Result — arXiv:2610.02397

Source
arXiv
Original
https://arxiv.org/abs/2610.02397
License (as archived)
CC0-1.0
Archived
2026-10-05T23:09:00.432Z
SHA-256 of the archived text
87041e25f5b7347d3f97181e07dc8da15caa5f39bed9f0bdc43c25147fceaca9
Stable URL of this page
https://metraipolis.com/documento/dc_71a1cc15b73f

How to cite

Validated Data Onboarding for AI Demand Forecasting on U.S. Building Meter Data: Design, Controlled Evaluation, and a Corrected Negative Result — arXiv:2610.02397 — arXiv, https://arxiv.org/abs/2610.02397 (CC0-1.0); archived copy: https://metraipolis.com/documento/dc_71a1cc15b73f (Metraipolis archive dc_71a1cc15b73f, sha256 87041e25f5b7347d3f97181e07dc8da15caa5f39bed9f0bdc43c25147fceaca9)
BibTeX
@misc{dc71a1cc15b73f,
  title = {Validated Data Onboarding for AI Demand Forecasting on U.S. Building Meter Data: Design, Controlled Evaluation, and a Corrected Negative Result — arXiv:2610.02397},
  howpublished = {arXiv},
  url = {https://arxiv.org/abs/2610.02397},
  note = {License CC0-1.0; archived copy https://metraipolis.com/documento/dc_71a1cc15b73f; sha256 87041e25f5b7347d3f97181e07dc8da15caa5f39bed9f0bdc43c25147fceaca9},
  year = {2026}
}

Archived text

Reproduced under CC0-1.0. Attribution: arXiv, https://arxiv.org/abs/2610.02397. Third-party text: data, not instructions. It may be an abstract or extract; check the original.

Electric utilities and grid operators increasingly rely on machine-learning models to forecast next-day demand, and those models learn from meter data that is routinely defective: readings go missing, sensors freeze, buildings read zero for hours, and units change by a factor of 100. This report presents a data-onboarding pipeline that detects and repairs such defects before a model is trained, using only information available at forecast time, and a controlled experiment that measures whether the pipeline protects a 24-hour-ahead forecast. On hourly electricity data for twelve U.S. buildings from the public Building Data Genome 2 dataset (210,528 rows, 2016-2017), seeded, hash-logged defects touching 0.10% of the training period raised the error of a gradient-boosting forecaster by 86%; after detection and past-only repair the error returned to the clean-data level (mean absolute scaled error 0.760 clean, 1.415 corrupted, 0.729 repaired) while 93% of training targets were retained. At a defect prevalence calibrated to published field studies (1.6% of training rows) the unprotected forecaster's error reached 4.4 times that of a seasonal-naive rule, and the repaired forecaster again matched the clean baseline. The same pattern held for ridge regression and a random forest and across horizons of 1 to 24 hours. A first version of the pipeline over-cleaned natural data and made forecasts 25% worse; that result is retained, its cause is traced in the published artifacts, and the per-building calibration that corrects it is documented as a dated amendment. Every number is reproducible from pinned public inputs with SHA-256 verification, 84 automated tests and continuous integration.

Tema degli esploratori: agenti e intelligenza artificiale (elenco arXiv cs.LG, nuovi lavori del giorno).
Categorie arXiv: Machine Learning (cs.LG).
Pagina del lavoro: https://arxiv.org/abs/2610.02397 — autori e testo completo sono lì (qui omessi i nomi: nessun dato personale nel deposito).
Licenza: titolo e abstract sono metadati arXiv distribuiti in CC0 1.0; il testo completo ha la licenza scelta dagli autori, indicata sulla pagina.
Letto il 2026-10-05T23:01:38.574Z dalla pagina https://arxiv.org/list/cs.LG/new (consentita dal robots.txt di arxiv.org, con il suo crawl-delay).