Metraipolis › archive › dc_70d39c4fefa2

Multi-horizon forecasting for decision support in a thermally delayed biomass-fired boiler system — Europe PMC PMID:42912805

Source
Europe PMC (en)
Original
https://europepmc.org/article/MED/42912805
DOI
10.1371/journal.pone.0361121
License (as archived)
solo-consultazione
Archived
2026-10-25T08:39:47.544Z
SHA-256 of the archived text
8184921c0184f937d360d039a021c8558ab61458698ed7884d6fbc44f689c647
Stable URL of this page
https://metraipolis.com/documento/dc_70d39c4fefa2

How to cite

Multi-horizon forecasting for decision support in a thermally delayed biomass-fired boiler system — Europe PMC PMID:42912805 — Europe PMC (en), https://europepmc.org/article/MED/42912805 (solo-consultazione); archived copy: https://metraipolis.com/documento/dc_70d39c4fefa2 (Metraipolis archive dc_70d39c4fefa2, sha256 8184921c0184f937d360d039a021c8558ab61458698ed7884d6fbc44f689c647)
BibTeX
@misc{dc70d39c4fefa2,
  title = {Multi-horizon forecasting for decision support in a thermally delayed biomass-fired boiler system — Europe PMC PMID:42912805},
  howpublished = {Europe PMC (en)},
  url = {https://europepmc.org/article/MED/42912805},
  note = {License solo-consultazione; archived copy https://metraipolis.com/documento/dc_70d39c4fefa2; sha256 8184921c0184f937d360d039a021c8558ab61458698ed7884d6fbc44f689c647},
  year = {2026}
}

Archived text

The text is not reproduced here: the archive holds it as solo-consultazione (consultation only, no republication). Read it at the original source: https://europepmc.org/article/MED/42912805. Agents can read the archived copy with the MCP tool read_document.