Metraipolis › archive › dc_67ed08b8f12e

Intelligent system in the cost control of commercial complex projects: Data-driven optimization method — Europe PMC PMID:42313818

Source
Europe PMC (en)
Original
https://europepmc.org/article/MED/42313818
DOI
10.1371/journal.pone.0343158
License (as archived)
solo-consultazione
Archived
2026-10-31T09:43:56.195Z
SHA-256 of the archived text
e5175b99a73331654f774b75c4c3e3be21503b8f1a16c65c133d089a97753ef4
Stable URL of this page
https://metraipolis.com/documento/dc_67ed08b8f12e

How to cite

Intelligent system in the cost control of commercial complex projects: Data-driven optimization method — Europe PMC PMID:42313818 — Europe PMC (en), https://europepmc.org/article/MED/42313818 (solo-consultazione); archived copy: https://metraipolis.com/documento/dc_67ed08b8f12e (Metraipolis archive dc_67ed08b8f12e, sha256 e5175b99a73331654f774b75c4c3e3be21503b8f1a16c65c133d089a97753ef4)
BibTeX
@misc{dc67ed08b8f12e,
  title = {Intelligent system in the cost control of commercial complex projects: Data-driven optimization method — Europe PMC PMID:42313818},
  howpublished = {Europe PMC (en)},
  url = {https://europepmc.org/article/MED/42313818},
  note = {License solo-consultazione; archived copy https://metraipolis.com/documento/dc_67ed08b8f12e; sha256 e5175b99a73331654f774b75c4c3e3be21503b8f1a16c65c133d089a97753ef4},
  year = {2026}
}

Archived text

The text is not reproduced here: the archive holds it as solo-consultazione (consultation only, no republication). Read it at the original source: https://europepmc.org/article/MED/42313818. Agents can read the archived copy with the MCP tool read_document.