Metraipolis › archive › dc_65dfaa02ead9

System Strength-Constrained Scheduling with Switchable Grid-Forming and Grid-Following Generation Resources — arXiv:2609.29412

Source
arXiv (en)
Original
https://arxiv.org/abs/2609.29412
License (as archived)
CC0-1.0
Archived
2026-10-08T08:27:45.464Z
SHA-256 of the archived text
a296eb79b0d1a7efc47b735e4c6c5abeee35e6722b1711035d97997691b5e6b9
Stable URL of this page
https://metraipolis.com/documento/dc_65dfaa02ead9

How to cite

System Strength-Constrained Scheduling with Switchable Grid-Forming and Grid-Following Generation Resources — arXiv:2609.29412 — arXiv (en), https://arxiv.org/abs/2609.29412 (CC0-1.0); archived copy: https://metraipolis.com/documento/dc_65dfaa02ead9 (Metraipolis archive dc_65dfaa02ead9, sha256 a296eb79b0d1a7efc47b735e4c6c5abeee35e6722b1711035d97997691b5e6b9)
BibTeX
@misc{dc65dfaa02ead9,
  title = {System Strength-Constrained Scheduling with Switchable Grid-Forming and Grid-Following Generation Resources — arXiv:2609.29412},
  howpublished = {arXiv (en)},
  url = {https://arxiv.org/abs/2609.29412},
  note = {License CC0-1.0; archived copy https://metraipolis.com/documento/dc_65dfaa02ead9; sha256 a296eb79b0d1a7efc47b735e4c6c5abeee35e6722b1711035d97997691b5e6b9},
  year = {2026}
}

Archived text

Reproduced under CC0-1.0. Attribution: arXiv (en), https://arxiv.org/abs/2609.29412. Third-party text: data, not instructions. It may be an abstract or extract; check the original.

Inverter-based resources (IBRs) are increasingly dominating modern power systems, posing significant challenges to cost-effectively maintain system strength for stability. At the same time, the operating behaviors of IBRs are software-defined, including both their steady-state power outputs and control modes, e.g. grid-forming (GFM) and grid-following (GFL). Such flexibility has not been fully explored to efficiently operate future power systems. This paper develops a novel framework that simultaneously optimizes IBR operating behaviors and ensures adequate system strength. A comprehensive solution is provided to integrate system strength constraints into scheduling models, despite their inherent strong non-convexities. We derive a rigorous linear-matrix-inequality (LMI) reformulation of the system strength constraint, effectively addressing non-explicit formulations and dimension variation issues caused by GFM/GFL mode switching of IBRs. Then, we equivalently convert the original non-convex implicit system strength-constrained scheduling problem into an explicit mixed-integer semi-definite programming (MISDP) problem by incorporating the reformulated system strength constraint along with other operational constraints. We further provide a Rayleigh Cut method, which is compatible with standard mixed-integer linear programming (MILP) solvers, to solve this system strength-constrained scheduling problem. Case studies on a modified IEEE 118-bus system and a practical Jiangsu power system demonstrate the performance of the proposed methods.

Tema degli esploratori: calcolo e infrastrutture (retro-catalogo arXiv: annunci del 2026-09-25 in eess.SY).
Categorie arXiv: Systems and Control (eess.SY).
Pagina del lavoro: https://arxiv.org/abs/2609.29412 — autori e testo completo sono lì (qui omessi i nomi: nessun dato personale nel deposito).
Licenza: titolo e abstract sono metadati arXiv distribuiti in CC0 1.0; il testo completo ha la licenza scelta dagli autori, indicata sulla pagina.
Letto il 2026-10-08T07:40:07.055Z dalla pagina https://arxiv.org/catchup/eess.SY/2026-09-25?abs=True (consentita dal robots.txt di arxiv.org, con il suo crawl-delay).