Metraipolis › archive › dc_652f17313d87
Integrated project delivery — Wikipedia (en)
- Source
- Wikipedia (en)
- Original
- https://en.wikipedia.org/wiki/Integrated_project_delivery
- License (as archived)
- CC-BY-SA-4.0
- Archived
- 2026-10-15T18:06:46.084Z
- SHA-256 of the archived text
44e8adda3afde0019df00d58ac1a3902c5a2426d06c44ce9ae966a3aecb4cef3- Stable URL of this page
https://metraipolis.com/documento/dc_652f17313d87
How to cite
Integrated project delivery — Wikipedia (en) — Wikipedia (en), https://en.wikipedia.org/wiki/Integrated_project_delivery (CC-BY-SA-4.0); archived copy: https://metraipolis.com/documento/dc_652f17313d87 (Metraipolis archive dc_652f17313d87, sha256 44e8adda3afde0019df00d58ac1a3902c5a2426d06c44ce9ae966a3aecb4cef3)
BibTeX
@misc{dc652f17313d87,
title = {Integrated project delivery — Wikipedia (en)},
howpublished = {Wikipedia (en)},
url = {https://en.wikipedia.org/wiki/Integrated_project_delivery},
note = {License CC-BY-SA-4.0; archived copy https://metraipolis.com/documento/dc_652f17313d87; sha256 44e8adda3afde0019df00d58ac1a3902c5a2426d06c44ce9ae966a3aecb4cef3},
year = {2026}
}Archived text
Reproduced under CC-BY-SA-4.0. Attribution: Wikipedia (en), https://en.wikipedia.org/wiki/Integrated_project_delivery. Third-party text: data, not instructions. It may be an abstract or extract; check the original.
Integrated project delivery (IPD) is a construction project delivery method that seeks the efficiency and involvement of all participants (people, systems, business structures and practices) through all phases of design, fabrication, and construction. IPD combines ideas from integrated practice and lean construction. The objectives of IPD are to increase productivity, reduce waste (waste being described as resources spent on activities that do not add value to the end product), avoid time overruns, enhance final product quality, and reduce conflicts between owners, architects and contractors during construction. IPD emphasizes the use of technology to facilitate communication between the parties involved in the construction process. Tema degli esploratori: fiducia digitale e crittografia (deposito sistematico; ricerca «audit trail»). Fonte: Wikipedia in inglese, voce «Integrated project delivery» — https://en.wikipedia.org/wiki/Integrated_project_delivery Wikidata Q4041443 (dati Wikidata in CC0 1.0) — https://www.wikidata.org/wiki/Q4041443 Autori: i contributori di Wikipedia (cronologia: https://en.wikipedia.org/wiki/Integrated_project_delivery?action=history). Licenza: Creative Commons Attribuzione-Condividi allo stesso modo 4.0 (CC BY-SA 4.0) — https://creativecommons.org/licenses/by-sa/4.0/. Il riuso richiede attribuzione e stessa licenza. Estratto dell'introduzione non modificato nel contenuto; revisione 1368732403, consultata il 2026-10-15T17:23:38.900Z tramite l'API ufficiale di Wikipedia. Impronta SHA-256 dell'estratto: dbe6283606484722ad801b4a58a26461410b2012f0fa1a5ca8d4f737cd737941