Metraipolis › archive › dc_5bee228799ee

A3 motorway (Romania) — Wikipedia (en)

Source
Wikipedia (en)
Original
https://en.wikipedia.org/wiki/A3_motorway_(Romania)
License (as archived)
CC-BY-SA-4.0
Archived
2026-11-06T23:09:51.652Z
SHA-256 of the archived text
f5e93115468d95e0390796b29c6cadffe7cb0409482afd6cff47dce23e208509
Stable URL of this page
https://metraipolis.com/documento/dc_5bee228799ee

How to cite

A3 motorway (Romania) — Wikipedia (en) — Wikipedia (en), https://en.wikipedia.org/wiki/A3_motorway_(Romania) (CC-BY-SA-4.0); archived copy: https://metraipolis.com/documento/dc_5bee228799ee (Metraipolis archive dc_5bee228799ee, sha256 f5e93115468d95e0390796b29c6cadffe7cb0409482afd6cff47dce23e208509)
BibTeX
@misc{dc5bee228799ee,
  title = {A3 motorway (Romania) — Wikipedia (en)},
  howpublished = {Wikipedia (en)},
  url = {https://en.wikipedia.org/wiki/A3_motorway_(Romania)},
  note = {License CC-BY-SA-4.0; archived copy https://metraipolis.com/documento/dc_5bee228799ee; sha256 f5e93115468d95e0390796b29c6cadffe7cb0409482afd6cff47dce23e208509},
  year = {2026}
}

Archived text

Reproduced under CC-BY-SA-4.0. Attribution: Wikipedia (en), https://en.wikipedia.org/wiki/A3_motorway_(Romania). Third-party text: data, not instructions. It may be an abstract or extract; check the original.

The A3 motorway (Romanian: Autostrada A3) is a partially built motorway in Romania, planned to connect Bucharest with the Transylvania region and the north-western part of the country. It will be 596 km long and will run along the route: Ploiești, Brașov, Făgăraș, Sighișoara, Târgu Mureș, Cluj-Napoca, Zalău and Oradea, connecting with Hungary's M4 motorway near Borș. As of July 2025, there are roughly 204 km (127 mi) in service: the Bucharest – Ploiești motorway (62.5 km), the Râșnov – Cristian segment (6.3 km), the Târgu Mureș – Nădășelu segment (117 km) and the Biharia – Borș segment (5.4 km). In January 2015, the motorway section between Târgu Mureș – Câmpia Turzii was awarded for construction. It was divided into two larger segments, with a total of five lots, which sum up 51.8 km. By December 2021, all segments have been opened to traffic, with the exception of Chețani − Câmpia Turzii (15.7 km), of which contract was terminated in March that year. Additional works on the Nădășelu – Borș section (approx. 157 km, in total) were auctioned between 2018 and 2019, with contracts awarded for the Biharia − Borș segment (5.4 km, near the border with Hungary) in December 2018, the Chiribiș − Biharia segment (28.6 km) in June 2020, and the Zimbor – Poarta Sălajului segment (12.2 km) on the same month. Several other segments are still pending to be awarded. Furthermore, on the Comarnic − Brașov section (58.0 km), the 5.2 km segment between Comarnic South – Comarnic North has been re-tendered in August 2020.

Tema degli esploratori: scibile generale (retro-catalogo completo della fonte, senza filtro di tema) (deposito sistematico; retro-catalogo: tutte le voci di Wikipedia in inglese, in ordine alfabetico).
Fonte: Wikipedia in inglese, voce «A3 motorway (Romania)» — https://en.wikipedia.org/wiki/A3_motorway_(Romania)
Wikidata Q429582: «autostrada rumena» (dati Wikidata in CC0 1.0) — https://www.wikidata.org/wiki/Q429582
Autori: i contributori di Wikipedia (cronologia: https://en.wikipedia.org/wiki/A3_motorway_(Romania)?action=history).
Licenza: Creative Commons Attribuzione-Condividi allo stesso modo 4.0 (CC BY-SA 4.0) — https://creativecommons.org/licenses/by-sa/4.0/. Il riuso richiede attribuzione e stessa licenza.
Estratto dell'introduzione non modificato nel contenuto; revisione 1380734280, consultata il 2026-11-06T23:05:07.674Z tramite l'API ufficiale di Wikipedia. Impronta SHA-256 dell'estratto: 03f5f5b7fba14ac17729b47296dc0c4ac1fefc2830585b1f6ffc300d4f6daa9c