Metraipolis › archive › dc_5bc1e371d47d
Renewables Obligation (United Kingdom) — Wikipedia (en)
- Source
- Wikipedia (en)
- Original
- https://en.wikipedia.org/wiki/Renewables_Obligation_(United_Kingdom)
- License (as archived)
- CC-BY-SA-4.0
- Archived
- 2026-10-08T00:20:43.446Z
- SHA-256 of the archived text
6772754b17b4b222f7ae5324e96803dff03b8e401aa7928eba24e4b2c1d4a53f- Stable URL of this page
https://metraipolis.com/documento/dc_5bc1e371d47d
How to cite
Renewables Obligation (United Kingdom) — Wikipedia (en) — Wikipedia (en), https://en.wikipedia.org/wiki/Renewables_Obligation_(United_Kingdom) (CC-BY-SA-4.0); archived copy: https://metraipolis.com/documento/dc_5bc1e371d47d (Metraipolis archive dc_5bc1e371d47d, sha256 6772754b17b4b222f7ae5324e96803dff03b8e401aa7928eba24e4b2c1d4a53f)
BibTeX
@misc{dc5bc1e371d47d,
title = {Renewables Obligation (United Kingdom) — Wikipedia (en)},
howpublished = {Wikipedia (en)},
url = {https://en.wikipedia.org/wiki/Renewables_Obligation_(United_Kingdom)},
note = {License CC-BY-SA-4.0; archived copy https://metraipolis.com/documento/dc_5bc1e371d47d; sha256 6772754b17b4b222f7ae5324e96803dff03b8e401aa7928eba24e4b2c1d4a53f},
year = {2026}
}Archived text
Reproduced under CC-BY-SA-4.0. Attribution: Wikipedia (en), https://en.wikipedia.org/wiki/Renewables_Obligation_(United_Kingdom). Third-party text: data, not instructions. It may be an abstract or extract; check the original.
The Renewables Obligation (RO) is a market support mechanism designed to encourage generation of electricity from eligible renewable sources in the United Kingdom. There are three related schemes for the three legal jurisdictions of the UK. In April 2002 the Renewables Obligation was introduced in England and Wales, and in Scotland as the Renewables Obligation (Scotland). The RO was introduced in Northern Ireland in April 2005. In all cases, the RO replaced the Non-Fossil Fuel Obligation which operated from 1990. The RO placed an obligation on licensed electricity suppliers in the United Kingdom to source an increasing proportion of electricity from renewable sources, similar to a renewable portfolio standard. This figure was initially set at 3% for the period 2002/03, and in 2010/11 it was 11.1% (4.0% in Northern Ireland). By 2020 it was almost half of all electricity in England, Wales and Scotland, and nearly 20% in Northern Ireland. An extension of the scheme from 2027 to 2037 was declared on 1 April 2010 and is detailed in the National Renewable Energy Action Plan. In 2026, the RO subsidised more than 30% of the UK's electricity generation. The RO closed to new generation between March 2015 and March 2017, with some grace periods. It was replaced by the Contracts for Difference scheme. Accredited generating stations will continue to receive 20 years of support, until March 2037. Tema degli esploratori: terra, clima ed energia (deposito sistematico; ricerca «renewable energy»). Fonte: Wikipedia in inglese, voce «Renewables Obligation (United Kingdom)» — https://en.wikipedia.org/wiki/Renewables_Obligation_(United_Kingdom) Wikidata Q7313126 (dati Wikidata in CC0 1.0) — https://www.wikidata.org/wiki/Q7313126 Autori: i contributori di Wikipedia (cronologia: https://en.wikipedia.org/wiki/Renewables_Obligation_(United_Kingdom)?action=history). Licenza: Creative Commons Attribuzione-Condividi allo stesso modo 4.0 (CC BY-SA 4.0) — https://creativecommons.org/licenses/by-sa/4.0/. Il riuso richiede attribuzione e stessa licenza. Estratto dell'introduzione non modificato nel contenuto; revisione 1345253812, consultata il 2026-10-07T23:57:54.839Z tramite l'API ufficiale di Wikipedia. Impronta SHA-256 dell'estratto: 7f9b77740ab90b7a08730a5cd2a2971bf40ab2601a30bf8a9b3550320de5be10