Metraipolis › archive › dc_59235e110106
Alameda Municipal Power — Wikipedia (en)
- Source
- Wikipedia (en)
- Original
- https://en.wikipedia.org/wiki/Alameda_Municipal_Power
- License (as archived)
- CC-BY-SA-4.0
- Archived
- 2026-11-08T01:19:23.406Z
- SHA-256 of the archived text
4379db739348296f80e181bbee7299ce83970560b01e525cd83c8b1721489559- Stable URL of this page
https://metraipolis.com/documento/dc_59235e110106
How to cite
Alameda Municipal Power — Wikipedia (en) — Wikipedia (en), https://en.wikipedia.org/wiki/Alameda_Municipal_Power (CC-BY-SA-4.0); archived copy: https://metraipolis.com/documento/dc_59235e110106 (Metraipolis archive dc_59235e110106, sha256 4379db739348296f80e181bbee7299ce83970560b01e525cd83c8b1721489559)
BibTeX
@misc{dc59235e110106,
title = {Alameda Municipal Power — Wikipedia (en)},
howpublished = {Wikipedia (en)},
url = {https://en.wikipedia.org/wiki/Alameda_Municipal_Power},
note = {License CC-BY-SA-4.0; archived copy https://metraipolis.com/documento/dc_59235e110106; sha256 4379db739348296f80e181bbee7299ce83970560b01e525cd83c8b1721489559},
year = {2026}
}Archived text
Reproduced under CC-BY-SA-4.0. Attribution: Wikipedia (en), https://en.wikipedia.org/wiki/Alameda_Municipal_Power. Third-party text: data, not instructions. It may be an abstract or extract; check the original.
Alameda Municipal Power (formerly Alameda Power & Telecom) is a municipal utility serving the City of Alameda, California. Founded in 1887, it provides electricity to c. 34,000 residential, commercial, and municipal customers at rates up to 20 percent below neighboring communities. The first engineer at the plant was HP Nielsen. As Alameda Power & Telecom, the utility previously provided Cable TV and high-speed Internet services to city residents; their system was acquired by Comcast on November 21, 2008, for $17 million. The estimated net result of this venture was a loss of more than $60 million for the City of Alameda. During 2014, 22 percent of AMP's power mix came from renewable resources, including biomass (landfill gas) from Pittsburg, Butte, Santa Cruz and Richmond, CA; small hydroelectric from Graeagle and Central Valley CA; and winds from the High Winds Project in Sonoma County, CA. An additional 15 percent of the power mix came from large hydroelectric projects in Calaveras, Shasta, and Central Valley, CA (California does not count power from large hydroelectric dams as renewable). All together, AMP's power is 37% carbon-neutral in 2014. AMP has been providing 100% clean energy since 2020 and did so in 2023 at approximately a 35% saving over comparable PG&E rates. Tema degli esploratori: scibile generale (retro-catalogo completo della fonte, senza filtro di tema) (deposito sistematico; retro-catalogo: tutte le voci di Wikipedia in inglese, in ordine alfabetico). Fonte: Wikipedia in inglese, voce «Alameda Municipal Power» — https://en.wikipedia.org/wiki/Alameda_Municipal_Power Wikidata Q4705873: «utility company in California» (dati Wikidata in CC0 1.0) — https://www.wikidata.org/wiki/Q4705873 Autori: i contributori di Wikipedia (cronologia: https://en.wikipedia.org/wiki/Alameda_Municipal_Power?action=history). Licenza: Creative Commons Attribuzione-Condividi allo stesso modo 4.0 (CC BY-SA 4.0) — https://creativecommons.org/licenses/by-sa/4.0/. Il riuso richiede attribuzione e stessa licenza. Estratto dell'introduzione non modificato nel contenuto; revisione 1383195261, consultata il 2026-11-08T01:16:32.965Z tramite l'API ufficiale di Wikipedia. Impronta SHA-256 dell'estratto: ecc4823a8ba1936902c24a1249e60a7db93116884ef307aba352a8d2c942523a