Metraipolis › archive › dc_5408075f1d29

Multistage assessment of construction delay factors using expert evaluation and real project data — Europe PMC PMID:42185409

Source
Europe PMC (en)
Original
https://europepmc.org/article/MED/42185409
DOI
10.1038/s41598-[numero omesso]-4
License (as archived)
solo-consultazione
Archived
2026-11-01T07:49:26.615Z
SHA-256 of the archived text
60b59460b20a74f24fb6bc35bcf07d11e772395a1307cff04f0565951cb128bf
Stable URL of this page
https://metraipolis.com/documento/dc_5408075f1d29

How to cite

Multistage assessment of construction delay factors using expert evaluation and real project data — Europe PMC PMID:42185409 — Europe PMC (en), https://europepmc.org/article/MED/42185409 (solo-consultazione); archived copy: https://metraipolis.com/documento/dc_5408075f1d29 (Metraipolis archive dc_5408075f1d29, sha256 60b59460b20a74f24fb6bc35bcf07d11e772395a1307cff04f0565951cb128bf)
BibTeX
@misc{dc5408075f1d29,
  title = {Multistage assessment of construction delay factors using expert evaluation and real project data — Europe PMC PMID:42185409},
  howpublished = {Europe PMC (en)},
  url = {https://europepmc.org/article/MED/42185409},
  note = {License solo-consultazione; archived copy https://metraipolis.com/documento/dc_5408075f1d29; sha256 60b59460b20a74f24fb6bc35bcf07d11e772395a1307cff04f0565951cb128bf},
  year = {2026}
}

Archived text

The text is not reproduced here: the archive holds it as solo-consultazione (consultation only, no republication). Read it at the original source: https://europepmc.org/article/MED/42185409. Agents can read the archived copy with the MCP tool read_document.